TEXAS · WELLS · TOM GREEN COUNTY · MUNN LEASE · API 42-451-31636 · DISTRICT 6E
Munn #8
Tom Green County · Fortson-Burke (Canyon) field · Vertical
Munn #8 (API 42-451-31636) is a plugged well in Tom Green County, plugged January 5, 1995, last operated by Hexagon Oil And Gas Inc..
The RRC has issued one drilling permit, issued October 11, 1985, permitted to 6,700 ft.
Completion filings report 4 formation tops, including San Angelo, Clear Fork, Cisco, Canyon.
Its lease has reported 437 barrels of oil and 20.2K mcf of gas since January 1993, with no volume in the three years through April 2026.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 16, 2026
- Permits on file
- 221
- Phone
- (817) 263-3500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hexagon Oil and Gas Inc. |
| Production reports | Hexagon Oil and Gas Inc.through Nov 1994 |
| Latest permit | Hexagon Oil and Gas Inc.Oct 11, 1985 |
- 6,700
- total depth, ft
- 1
- permits on file
- Oct 11, 1985
- last permit issued
- Nov 24, 1985
- completed
- 437
- cumulative oil, bbl
- 20.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 24, 1985
- Shut in
- —
- Plugged
- Jan 5, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Munn G-9-119265 | Fortson-Burke (Canyon) | Hexagon Oil and Gas Inc. | 1 | 437 | 20.2K | Jan 1993 – Nov 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hexagon Oil and Gas Inc.Jan 1993 → Nov 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 287204-99 | Drill | Hexagon Oil and Gas Inc. | Oct 11, 1985 | Oct 11, 1985 | Oct 22, 1985 | 6,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 24, 1985 | Munn G-9-119265 | Fortson-Burke (Canyon) | Hexagon Oil and Gas Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,116 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San AngeloSAN ANGELO SAND | 695 | 1,421 |
| Clear ForkCLEARFORK | 930 | 1,186 |
| Cisco | 5,382 | -3,266 |
| Canyon | 6,130 | -4,014 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,130 | 6,357 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 474 | 11 | 275 S |
| 4.5 | 6,640 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 8, 1986 | Dec 11, 1985 | Yes |
| 00 | Jan 3, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-31636 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-31636 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45131636, documented in the API reference.