WELL · 42-451-32108 · DISTRICT 7

Stansberry #1

Plugged

Tom Green County · Toe Nail North (Strawn) field  · Vertical

Stansberry #1 (API 42-451-32108) is a plugged well in Tom Green County, plugged December 11, 2020, last operated by Remuda Operating Company.

The RRC has issued 2 drilling permits between 1991 and 1993, permitted to 5,800 ft.

Completion filings report 5 formation tops, including Canyon, Swastika, Palo Pinto, Harkey.

Its 2 leases have reported 188K barrels of oil and 108K mcf of gas since January 1993, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Remuda Operating Company

Based in
Midland, TX
P-5 status
Delinquent (D)
P-5 last filed
Apr 4, 2025
Permits on file
214
Phone
(432) 684-8003

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRemuda Operating Company
Production reportsRemuda Operating Companythrough Nov 2019
Latest permitRemuda Operating CompanyDec 28, 1993
5,800
total depth, ft
2
permits on file
Dec 28, 1993
last permit issued
Feb 29, 1992
completed
188K
cumulative oil, bbl
108K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 29, 1992
Shut in
—
Plugged
Dec 11, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stansberry, R.L. Trust O-9-13557Toe Nail, North (Harkey)Remuda Operating Company4188K108KDec 1993 – Jul 2026
Stansberry G-9-141150Toe Nail, North (Strawn)Remuda Operating Company100Jan 1993 – Dec 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Remuda Operating CompanyDec 1993 → Nov 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
419725-99RecompletionRemuda Operating CompanyDec 28, 1993Dec 28, 1993Dec 21, 19934,970
393972-99DrillVentura Petroleum CorporationNov 14, 1991Nov 19, 1991Dec 2, 19925,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-141150————
—— O-9-13557————

Formation tops

As filed on W-2/G-1. Subsea from 2,346 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON LIME3,640-1,294
Swastika3,640-1,294
Palo Pinto4,530-2,184
Harkey4,710-2,364
StrawnSTRAWN LIME5,300-2,954

Perforations

Perforated and open-hole intervals.

FromToType
4,7174,724Perforated
5,3185,328Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62552311250 S
5.55,4857.8754,208 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 11, 1994Dec 31, 1993Yes
00Jan 7, 1994—Yes
00Jun 9, 1992Apr 6, 1992Yes
00Apr 28, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
May 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000079730W-14 DisposalPlugged Feb 22, 20213001,5003,710–3,815

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45132108, documented in the API reference.