WELL · 42-451-32163 · DISTRICT 7
Anson, Louise "B" #25
Tom Green County · Vertical
Anson, Louise "B" #25 (API 42-451-32163) is a plugged well in Tom Green County, plugged July 18, 1992, last operated by Smc Oil & Gas, Inc..
The RRC has issued 2 drilling permits between 1992 and 1993, permitted to 5,750 ft.
Completion filings report 4 formation tops, including Palo Pinto, Mt Susan Lime, Canyon, Strawn.
Its lease has reported 107K barrels of oil and 31.7K mcf of gas since January 1994, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jan 30, 2026
- Permits on file
- 34
- Phone
- (432) 683-3835
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Escondido Bay Corporationthrough Apr 2026 |
| Latest permit | SMC Oil & Gas, Inc.Oct 15, 1993 |
- 5,750
- total depth, ft
- 2
- permits on file
- Oct 15, 1993
- last permit issued
- —
- completed
- 107K
- cumulative oil, bbl
- 31.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jul 18, 1992
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Anson, Louise "B" O-9-13564 | H-J (Strawn) | Escondido Bay Corporation | 2 | 107K | 31.7K | Jan 1994 – Jul 2026 |
Oil, barrels lease total
Last 12 months 9 · prior 12 50(-82%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1SMC Oil & Gas, Inc.Mar 1994 → Sep 2021
- 2Escondido Bay CorporationMay 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416946-99 | Reenter | SMC Oil & Gas, Inc. | Oct 11, 1993 | Oct 15, 1993 | Nov 25, 1993 | 5,700 |
| 400744-99 | Drill | MW Petroleum Corporation | Jul 1, 1992 | Jul 1, 1992 | Jul 7, 1992 | 5,750 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13564 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,108 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 4,934 | -2,826 |
| MT Susan Lime | 5,406 | -3,298 |
| Canyon | 5,455 | -3,347 |
| Strawn | 5,516 | -3,408 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,517 | 5,535 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 519 | 12.25 | 825 S |
| 5.5 | 5,648 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 8, 1994 | Jan 18, 1994 | — |
| 00 | Jan 26, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-32163 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-32163 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45132163, documented in the API reference.