TEXAS · WELLS · UPTON COUNTY · WINDHAM MOBIL 145 LEASE · API 42-461-33600 · DISTRICT 6E
Windham Mobil 145 #1
Upton County · Amacker-Tippett SW (Wolfcamp) field · Vertical
Windham Mobil 145 #1 (API 42-461-33600) is a plugged well in Upton County, plugged December 24, 1996, last operated by Thompson J. Cleo.
The RRC has issued one drilling permit (amended once), issued January 16, 1996, permitted to 9,500 ft.
Completion filings report 6 formation tops, including Yates, Queen, Glorieta, Leonard.
Its lease has reported 2.06K barrels of oil and 2.96K mcf of gas since February 1996, with no volume in the three years through April 2026.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 30, 2024
- Permits on file
- 1,739
- Phone
- (214) 953-1177
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Thompson J. Cleo |
| Production reports | Thompson, J. Cleothrough Oct 1996 |
| Latest permit | Thompson, J. CleoJan 16, 1996 |
- 9,500
- total depth, ft
- 2
- permits on file
- Jan 16, 1996
- last permit issued
- Feb 26, 1996
- completed
- 2.06K
- cumulative oil, bbl
- 2.96K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Oct 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 26, 1996
- Shut in
- —
- Plugged
- Dec 24, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Windham Mobil 145 O-9-14343 | Amacker-Tippett, SW (Wolfcamp) | Thompson, J. Cleo | 1 | 2.06K | 2.96K | Feb 1996 – Oct 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Thompson, J. CleoFeb 1996 → Oct 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 443659-98 | Drill | Thompson, J. Cleo | Mar 5, 1996 | Jan 16, 1996 | Jan 18, 1996 | 9,500 |
| 443659-99 | Drill | Thompson, J. Cleo | Jan 12, 1996 | Jan 16, 1996 | — | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 26, 1996 | Windham Mobil 145 O-9-14343 | Amacker-Tippett SW (Wolfcamp) | Thompson J. Cleo | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,714 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,925 | 8,958 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 540 | 17.5 | 460 S |
| 8.625 | 4,570 | 11 | 1,200 S |
| 4.5 | 9,496 | 7.875 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 10, 1996 | Mar 4, 1996 | Yes |
| 00 | Mar 25, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-461-33600 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-461-33600 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46133600, documented in the API reference.