WELL · 42-465-30400 · DISTRICT 1
Cauthorn-D #3
Val Verde County · JO Nell (Canyon D) field · Vertical
Cauthorn-D #3 (API 42-465-30400) is a plugged well in Val Verde County, plugged March 12, 2002, last operated by Phillips Petroleum Company.
The RRC has issued 2 drilling permits between 1982 and 1993, permitted to 10,300 ft.
Completion filings report 7 formation tops, including Base Cretaceous (marker), Friend Zone, Tent Sawyer Sand, Aldwell Sand.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 30, 2002
- Permits on file
- 2,544
- Phone
- (918) 661-6600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Phillips Petroleum Company |
| Production reports | none |
| Latest permit | Phillips Petroleum CompanySep 9, 1993 |
- 10,300
- total depth, ft
- 2
- permits on file
- Sep 9, 1993
- last permit issued
- Nov 30, 1993
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 30, 1993
- Shut in
- —
- Plugged
- Mar 12, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cauthorn -D- G-1-100168 | Vinegarone (Strawn) | Phillips Petroleum Company | 1 | 0 | 0 | Jan 1993 – Mar 2002 |
| Cauthorn-D G-9-149447 | JO Nell (Canyon D) | Phillips Petroleum Company | 1 | 0 | 0 | Nov 1993 – Mar 2002 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 415832-99 | Recompletion | Phillips Petroleum Company | Sep 9, 1993 | Sep 9, 1993 | Nov 8, 1993 | 8,650 |
| 150487-99 | Drill | Phillips Petroleum Company | Feb 8, 1982 | Feb 8, 1982 | — | 10,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-149447 | — | — | — | — |
| — | — G-1-100168 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,017 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Cretaceous (marker)BASE CRETACEOUS | 848 | 1,169 |
| Friend Zone | 2,954 | -937 |
| Tent Sawyer Sand | 4,866 | -2,849 |
| Aldwell Sand | 7,015 | -4,998 |
| JO Nell Sand | 8,004 | -5,987 |
| CanyonBASE CANYON SAND | 8,813 | -6,796 |
| StrawnSTRAWN B ZONE | 9,768 | -7,751 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,614 | 8,773 | Perforated |
| 9,770 | 9,853 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,650 | 12.25 | 550 S |
| 2.875 | 9,630 | — | — |
| 5.5 | 10,142 | 7.875 | 990 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 12, 1994 | Jun 1, 1994 | Yes |
| 00 | Jun 8, 1994 | — | — |
| 00 | Jan 12, 1984 | Jun 24, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-465-30400 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-465-30400 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46530400, documented in the API reference.