WELL · 42-465-30633 · DISTRICT 1

Arledge Phillip #6

Y

Val Verde County · Will O. (Ellenburger) field · Producing  · Vertical

Arledge Phillip #6 (API 42-465-30633) is a well in Val Verde County operated by Perdido Energy LLC, completed March 31, 2001 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 19, 2000, permitted to 15,400 ft.

It was permitted by Prize Operating Company and has since transferred to Perdido Energy LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Canyon, Strawn, Simpson, Ellenburger.

No lease production has been reported under this well’s leases.

Operator of record

Perdido Energy LLC

Permitted by Prize Operating Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Oct 22, 2025
Phone
(713) 357-3300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePerdido Energy LLC
Production reportsPerdido Energy, LLCthrough Jan 2026
Latest permitPrize Operating CompanyDec 19, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,400
total depth, ft
1
permits on file
Dec 19, 2000
last permit issued
Mar 31, 2001
completed
0
cumulative oil, bbl
4.04M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 31, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arledge, Phillip G-1-182475Will O. (Ellenburger)Perdido Energy, LLC104.04MMar 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 5,252 · prior 12 38,333(-86%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Prize Operating CompanyApr 2001 → Mar 2002
  2. 2Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  3. 3Cimarex Energy Co. of ColoradoMay 2006 → May 2013
  4. 4Willo Oil & Gas Exploration, LLCJun 2013 → Jul 2020
  5. 5Arledge Gas Gathering, LPJan 2015 → Nov 2015
  6. 6Perdido Energy, LLCAug 2020 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
502754-99DrillPrize Operating CompanyDec 7, 2000Dec 19, 2000Jan 29, 200115,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-182475————

Formation tops

As filed on W-2/G-1. Subsea from 2,173 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonUPPER CANYON3,683-1,510
Strawn11,662-9,489
Simpson12,602-10,429
Ellenburger13,150-10,977

Perforations

Perforated and open-hole intervals.

FromToType
13,19113,536Perforated
13,61514,002Perforated
14,11714,600Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,07617.5820 S
9.6255,23912.251,050 S
714,1208.5955 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 2002Oct 31, 2001Yes
00Jul 24, 2001May 7, 2001Yes
00May 31, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46530633, documented in the API reference.