WELL · 42-465-30789 · DISTRICT 1
Ranch J. A. -K- #3
Val Verde County · Vinegarone (Strawn) field · Producing · Vertical
Ranch J. A. -K- #3 (API 42-465-30789) is a well in Val Verde County operated by White Rock Oil & Gas LLC, completed October 26, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued December 7, 2005, permitted to 11,100 ft.
It was permitted by Conocophillips Company and has since transferred to White Rock Oil & Gas LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Canyon, Strawn.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Conocophillips Company; the EWA schedule now lists a different operator.
- Based in
- Plano, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 18, 2025
- Permits on file
- 31
- Phone
- (214) 981-1400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | White Rock Oil & Gas LLC |
| Production reports | White Rock Oil & Gas, LLCthrough Apr 2026 |
| Latest permit | Conocophillips CompanyDec 7, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,100
- total depth, ft
- 2
- permits on file
- Dec 7, 2005
- last permit issued
- Oct 26, 2006
- completed
- 0
- cumulative oil, bbl
- 57.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 26, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ranch, J. A. -K- G-1-228675 | Vinegarone (Strawn) | White Rock Oil & Gas, LLC | 1 | 0 | 57.5K | Aug 2006 – Jul 2026 |
Gas, mcf lease total
Last 12 months 432 · prior 12 1,292(-67%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Conocophillips CompanyAug 2006 → Aug 2018
- 2White Rock Oil & Gas, LLCSep 2018 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 609381-97 | Other | Conocophillips Company | May 14, 2007 | Dec 7, 2005 | May 24, 2006 | 11,100 |
| 609381-99 | Drill | Conocophillips Company | Nov 10, 2005 | Dec 7, 2005 | May 24, 2006 | 11,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-228675 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,058 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,698 | 9,852 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,030 | 12.25 | 787 S |
| 7 | 9,280 | 8.75 | 395 S |
| 4.5 | 10,149 | 6 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 2007 | Mar 28, 2007 | Yes |
| 00 | Aug 1, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-465-30789 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-465-30789 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46530789, documented in the API reference.