WELL · 42-475-31812 · DISTRICT 8
Monroe Gas Unit No. 2 #1
Ward County · Soda Lake (Fusselman) field · Vertical
Monroe Gas Unit NO. 2 #1 (API 42-475-31812) is a plugged well in Ward County, plugged November 30, 1994, last operated by Baxter D. B. Inc..
The RRC has issued 3 drilling permits (amended once) between 1979 and 2004, permitted to 19,500 ft.
It was permitted by Crystal River Oil & Gas LLC and has since transferred to Baxter D. B. Inc. on the wellbore schedule.
Completion filings report 7 formation tops, including Rustler, Salado, Delaware, Brushy Canyon.
Its 4 leases have reported 40.3K barrels of oil and 45.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Crystal River Oil & Gas LLC; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 13, 2026
- Permits on file
- 30
- Phone
- (432) 631-0624
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Baxter D. B. Inc. |
| Production reports | RJD Energy, LLCthrough Apr 2016 |
| Latest permit | Crystal River Oil & Gas LLCApr 20, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 19,500
- total depth, ft
- 4
- permits on file
- Apr 20, 2004
- last permit issued
- —
- completed
- 40.3K
- cumulative oil, bbl
- 45.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Nov 30, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monroe Gas Unit No. 2 O-10-43872 | Phantom (Wolfcamp) | RJD Energy, LLC | 1 | 4.36K | 6.56K | Mar 2012 – Jul 2026 |
| Monroe Gas Unit No. 2 O-10-37661 | Quito (Wolfcamp) | Crystal River Oil & Gas LLC | 1 | 35.9K | 38.9K | Apr 2004 – Mar 2014 |
| Monroe Gas Unit No. 2 G-10-136125 | G-M (Penn.) | K.W.A., Inc. | 1 | 0 | 0 | Jan 1993 – Nov 1994 |
| — G-10-91337 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Crystal River Oil & Gas LLCApr 2004 → Aug 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 544671-99 | Reenter | Crystal River Oil & Gas LLC | Apr 20, 2004 | Apr 20, 2004 | Feb 22, 2004 | 19,250 |
| 367630-97 | Recompletion | Baxter, D. B. Inc. | Dec 13, 1989 | Dec 13, 1989 | May 17, 1990 | 19,250 |
| 367630-98 | Recompletion | Baxter, D. B. Inc. | Dec 13, 1989 | Dec 13, 1989 | — | 19,250 |
| 43482-99 | Drill | Exxon Corp. | Feb 22, 1979 | Feb 22, 1979 | Mar 16, 1979 | 19,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-91337 | — | — | — | — |
| — | — G-10-136125 | — | — | — | — |
| — | — O-10-37661 | — | — | — | — |
| — | — O-10-43872 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,709 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 1,040 | 1,669 |
| Salado | 1,163 | 1,546 |
| Delaware | 1,960 | 749 |
| Delaware | 4,960 | -2,251 |
| Brushy Canyon | 7,045 | -4,336 |
| Bone Spring | 8,572 | -5,863 |
| Bone Spring | 8,573 | -5,864 |
| Wolfcamp | 10,565 | -7,856 |
| Pennsylvanian | 14,950 | -12,241 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,206 | 11,216 | Perforated |
| 11,345 | 11,355 | Perforated |
| 11,373 | 11,383 | Perforated |
| 14,986 | 17,080 | Perforated |
| 19,168 | 19,212 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 637 | 26 | 950 S |
| 13.375 | 4,849 | 17.5 | 4,750 S |
| 10.75 | 11,800 | 12.25 | 2,280 S |
| 5 | 17,400 | 9.5 | 875 S |
| 2.875 | 19,002 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 31, 2014 | Nov 15, 2005 | Yes |
| 00 | Jun 27, 2006 | Nov 15, 2005 | Yes |
| 00 | Mar 16, 2006 | — | — |
| 00 | Feb 21, 1991 | Sep 24, 1990 | Yes |
| 00 | Dec 5, 1990 | — | — |
| 00 | Jan 12, 1984 | Jan 26, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-31812 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-31812 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47531812, documented in the API reference.