WELL · 42-475-31908 · DISTRICT 8

Smith Sealy -B- #3

Plugged

Ward County · C & M (Queen) field  · Vertical

Smith Sealy -B- #3 (API 42-475-31908) is a plugged well in Ward County, plugged September 17, 2025, last operated by Bcp Resources LLC.

The RRC has issued one drilling permit, issued June 18, 1979, permitted to 3,200 ft.

It was permitted by Kern CO. and has since transferred to Bcp Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Rustler, Yates, Queen.

Its lease has reported 3.94K barrels of oil and 36 mcf of gas since January 1993, last reporting in October 2025. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

BCP Resources LLC

Permitted by Kern Co.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 18, 2026
Permits on file
3
Phone
(432) 246-8346

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBCP Resources LLC
Production reportsSmith & Marrs Inc.through Dec 1995
Latest permitKern Co.Jun 18, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,200
total depth, ft
1
permits on file
Jun 18, 1979
last permit issued
Apr 11, 2014
completed
3.94K
cumulative oil, bbl
36
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 11, 2014
Shut in
—
Plugged
Sep 17, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Sealy -B- O-10-25546C & M (Queen)BCP Resources, LLC23.94K36Jan 1993 – Oct 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kern Co.Jan 1993 → Jun 1994
  2. 2Smith & Marrs Inc.Jul 1994 → Dec 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
50943-99DrillKern Co.Jun 18, 1979Jun 18, 1979Jul 29, 19793,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-25546————

Formation tops

As filed on W-2/G-1. Subsea from 2,618 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler7951,823
Yates2,328290
Queen2,996-378

Perforations

Perforated and open-hole intervals.

FromToType
3,0353,060Perforated
3,0463,051Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,02612.25400 S
2.3753,045——
4.53,0907.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 15, 2014Apr 25, 2014—
00Jun 8, 1999Apr 9, 1999—
00Mar 5, 1990Feb 9, 1990—
00Jan 12, 1984Sep 5, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
125K
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083977H-1 InjectionPlugged Oct 7, 20251001,5003,035–3,060

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47531908, documented in the API reference.