TEXAS · WELLS · WARD COUNTY · SEALY SMITH FOUNDATION LEASE · API 42-475-33877 · DISTRICT 7B

Sealy Smith Foundation #311

Plugged

Ward County · Monahans (Clear Fork) field  · Vertical

Sealy Smith Foundation #311 (API 42-475-33877) is a plugged well in Ward County, plugged July 7, 2026, last operated by Occidental Permian Ltd..

The RRC has issued 2 drilling permits (amended once) between 1988 and 2016, permitted to 12,500 ft.

Completion filings report 6 formation tops, including Base Red Beds, Yates, Seven Rivers, Queen.

Its lease has reported 4.66M barrels of oil and 5.39M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 260 wells, so these are lease totals, not this well alone.

Operator of record

Occidental Permian Ltd.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Permits on file
6,251
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOccidental Permian Ltd.
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitOccidental Permian Ltd.Apr 12, 2016
12,500
total depth, ft
3
permits on file
Apr 12, 2016
last permit issued
Mar 20, 1992
completed
4.66M
cumulative oil, bbl
5.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 20, 1992
Shut in
—
Plugged
Jul 7, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 260 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sealy Smith Foundation O-10-4403Monahans (Clear Fork)Occidental Permian Ltd.2604.66M5.39MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 31,987 · prior 12 25,009(+28%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 48,290 · prior 12 41,806(+16%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
814822-99RecompletionOccidental Permian Ltd.Apr 5, 2016Apr 12, 2016—12,500
343444-98DrillShell Western E&P Inc.Apr 21, 1988Mar 3, 1988—5,400
343444-99DrillShell Western E&P Inc.Mar 3, 1988Mar 3, 1988—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 20, 1992Sealy Smith Foundation O-10-4403Monahans (Clear Fork)Occidental Permian Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,674 ft elevation.Download CSV →

FormationMD ftSubsea
Base Red Beds7781,896
Yates2,340334
Seven Rivers2,60074
Queen3,045-371
San Andres3,605-931
Glorieta4,751-2,077

Perforations

Perforated and open-hole intervals.

FromToType
4,7545,210Perforated
4,7545,410Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37521017.5265 S
8.6251,01512.25925 S
5.55,3497.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 1, 1992Aug 17, 1992—
00Aug 3, 1988Jul 18, 1988Yes
00Jul 26, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533877, documented in the API reference.