WELL · 42-475-33878 · DISTRICT 8

Sealy Smith Foundation #312

N

Ward County  · Vertical

Sealy Smith Foundation #312 (API 42-475-33878) is a former disposal or injection well in Ward County, last operated by Occidental Permian Ltd.; its UIC permit is no longer active.

The RRC has issued 3 drilling permits between 1988 and 2016, permitted to 12,500 ft.

Completion filings report 6 formation tops, including Base Red Beds, Yates, Seven Rivers, Queen.

Its lease has reported 4.66M barrels of oil and 5.39M mcf of gas since January 1993, last reporting in July 2026. The lease carries 260 wells, so these are lease totals, not this well alone.

Operator of record

Occidental Permian Ltd.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Permits on file
6,251
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitOccidental Permian Ltd.Sep 14, 2016
12,500
total depth, ft
3
permits on file
Sep 14, 2016
last permit issued
—
completed
4.66M
cumulative oil, bbl
5.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 260 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sealy Smith Foundation O-10-4403Monahans (Clear Fork)Occidental Permian Ltd.2604.66M5.39MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 31,987 · prior 12 25,009(+28%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 48,290 · prior 12 41,806(+16%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
818349-99RecompletionOccidental Permian Ltd.Sep 8, 2016Sep 14, 2016—12,500
814823-99RecompletionOccidental Permian Ltd.Apr 5, 2016Apr 12, 2016—12,500
343439-99DrillShell Western E&P Inc.Mar 3, 1988Mar 3, 1988—5,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-4403————

Formation tops

As filed on W-2/G-1. Subsea from 2,679 ft elevation.Download CSV →

FormationMD ftSubsea
Base Red Beds7761,903
Yates2,343336
Seven Rivers2,60574
Queen3,047-368
San Andres3,610-931
Glorieta4,740-2,061

Perforations

Perforated and open-hole intervals.

FromToType
4,7815,235Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37517117.5240 S
8.62598312.25650 S
5.55,3007.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 2, 1988Jul 18, 1988Yes
00Jul 26, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000073427H-1 InjectionNot activated1,2501,5004,550–5,350

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119941995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533878, documented in the API reference.