TEXAS · WELLS · WARD COUNTY · CAMPBELL ESTATE ET AL LEASE · API 42-475-34631 · DISTRICT 7B

Campbell Estate et Al #3H

Y

Ward County · Block 16 (Montoya) field · Producing  · Horizontal

Campbell Estate ET AL #3H (API 42-475-34631) is a horizontal well in Ward County operated by Xto Energy Inc., completed July 25, 2000 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 20, 2000, permitted to 14,541 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Rustler, Delaware, Wolfcamp, Strawn.

Its lease has reported 17.6K barrels of oil and 8.15M mcf of gas since July 2000, last reporting volume in March 2026.

Operator of record

XTO Energy Inc.

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Mar 2026
Latest permitMobil Producing TX. & N.M. Inc.Mar 20, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,541
total depth, ft
1
permits on file
Mar 20, 2000
last permit issued
Jul 25, 2000
completed
17.6K
cumulative oil, bbl
8.15M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2000 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 25, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell Estate et Al G-10-180059Block 16 (Montoya)XTO Energy Inc.117.6K8.15MJul 2000 – Mar 2026

Gas, mcf lease total

Last 12 months 7,543 · prior 12 7,123(+6%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jul 2000 → Dec 2011
  2. 2XTO Energy Inc.Jan 2012 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
493269-99DrillMobil Producing TX. & N.M. Inc.Mar 21, 2000Mar 20, 2000Apr 4, 200014,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 25, 2000Campbell Estate et Al G-10-180059Block 16 (Montoya)XTO Energy Inc.Producing14,541

Formation tops

As filed on W-2/G-1. Subsea from 2,549 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,000549
Delaware4,821-2,272
Wolfcamp9,078-6,529
Strawn10,261-7,712
Atoka10,470-7,921

Perforations

Perforated and open-hole intervals.

FromToType
13,44417,129Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
208030344 S
13.3752,82017.51,350 S
9.6259,83012.252,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 2, 2001Aug 23, 2000Yes
00Jan 2, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534631, documented in the API reference.