WELL · 42-475-36617 · DISTRICT 8

Arco - State 33-28 #20D

N

Ward County · Scott (Cherry Canyon) field  · Vertical

Arco - State 33-28 #20D (API 42-475-36617) is a well in Ward County operated by Jetta Operating Company Inc., completed July 22, 2014.

The RRC has issued 2 drilling permits between 2014 and 2015, permitted to 9,500 ft.

Completion filings report 13 formation tops, including Rustler, Castile, Delaware, Bell Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 3.57M barrels injected in the 12 months reported through July 2025.

Operator of record

Jetta Operating Company Inc.

Fort Worth, TX · P-5 Y, filed Apr 4, 2026 · 605 permits on file · (817) 312-8504

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsnone
Latest permitJetta Operating Company, Inc.May 12, 2015
9,500
total depth, ft
2
permits on file
May 12, 2015
last permit issued
Jul 22, 2014
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco 33-28 O-10-46726Pyote Bay (Brushy Canyon)R360 Water Solutions, LLC200Jul 2014 – Jul 2026
Arco - State 33-28 O-10-45903Scott (Cherry Canyon)Jetta Operating Company, Inc.100Jul 2014 – Sep 2015

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
806218-99RecompletionJetta Operating Company, Inc.May 4, 2015May 12, 2015Jul 11, 20149,500
776501-99DrillJetta Operating Company, Inc.Jan 2, 2014Jan 15, 2014Jul 11, 20148,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-45903————
—— O-10-46726————

Formation tops

As filed on W-2/G-1. Subsea from 2,576 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler5861,990
CastileCASTILLE2,920-344
Delaware5,033-2,457
DelawareDELAWARE (LAMAR)5,033-2,457
Bell Canyon5,065-2,489
Ford5,153-2,577
Clear ForkCLEARFORK——
Glorieta——
Holt——
Queen——
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO——
Seven Rivers——
Tubb——
Yates——

Perforations

Perforated and open-hole intervals.

FromToType
6,9477,132Perforated
6,9477,132Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.751,21814.75670 S
11.751,22014.75670 S
8.6256,99610.625930 S
8.6257,00010.625930 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 2026Apr 16, 2026—
00Jul 12, 2022Mar 22, 2022—
00Sep 10, 2015Jul 23, 2015Yes
00Mar 30, 2015Jan 13, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.57M
bbl, last 12 reported months
48.9M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000109778H-1 InjectionActive30,0003,2506,500–8,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,570,447 · prior 12 3,354,408(+6%)

0200K400K600K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536617, documented in the API reference.