WELL · 42-475-36667 · DISTRICT 8

Barstow 17 #20DR

N

Ward County  · Vertical

Barstow 17 #20DR (API 42-475-36667) is a former disposal or injection well in Ward County, last operated by Jetta Operating Company, Inc.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits between 2014 and 2015, permitted to 9,000 ft.

Completion filings report 3 formation tops, including Rustler, Delaware, Cherry Canyon.

Its 2 leases have reported 559K barrels of oil and 2.69M mcf of gas since October 2008, last reporting in July 2026. The leases carry 16 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company, Inc.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsJetta Operating Company, Inc.through Apr 2026
Latest permitJetta Operating Company, Inc.May 6, 2015
9,000
total depth, ft
2
permits on file
May 6, 2015
last permit issued
—
completed
559K
cumulative oil, bbl
2.69M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barstow 17 O-10-54845Collie (Delaware)Jetta Operating Company, Inc.8193K1.28MFeb 2020 – Jul 2026
Barstow 17 O-10-39200Scott (Cherry Canyon)Jetta Operating Company, Inc.8366K1.41MOct 2008 – Dec 2020

Gas, mcf lease total

Last 12 months 189,588 · prior 12 184,095(+3%)

010K20K202420252026

Oil, barrels lease total

Last 12 months 24,966 · prior 12 27,131(-8%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jetta Operating Company, Inc.Oct 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
806221-99RecompletionJetta Operating Company, Inc.May 4, 2015May 6, 2015—9,000
780707-99DrillJetta Operating Company, Inc.Feb 26, 2014Feb 27, 2014Mar 10, 20147,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-39200————
—— O-10-54845————

Formation tops

As filed on W-2/G-1. Subsea from 2,546 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler7341,812
Delaware4,813-2,267
Cherry Canyon5,769-3,223

Perforations

Perforated and open-hole intervals.

FromToType
6,6756,975Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.751,72014.75840 S
8.6257,01210.625330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 2020Aug 15, 2014Yes
00Jan 13, 2015Aug 15, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
4.5M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000109650H-1 InjectionPlugged Dec 17, 202530,0003,2506,500–8,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536667, documented in the API reference.