WELL · 42-475-37139 · DISTRICT 8

Gum Popper #1

Y

Ward County · Tunstill (Delaware) field · Injection  · Vertical

Gum Popper #1 (API 42-475-37139) is a well in Ward County operated by Continental Resources Inc., completed May 26, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 7, 2016, permitted to 7,500 ft.

It was permitted by Jagged Peak Energy LLC and has since transferred to Continental Resources Inc. on the wellbore schedule.

Completion filings report 10 formation tops, including Dockum Aquifer, Rustler, Seven Rivers, Yates.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 3.15M barrels injected in the 12 months reported through April 2026.

Operator of record

Continental Resources Inc.

Permitted by Jagged Peak Energy LLC; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Aug 4, 2025 · 552 permits on file · (405) 234-9000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleContinental Resources Inc.
Production reportsnone
Latest permitJagged Peak Energy LLCOct 7, 2016

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
2
permits on file
Oct 7, 2016
last permit issued
May 26, 2017
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 26, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gum Popper G-10-282437Tunstill (Delaware)Continental Resources, Inc.100May 2017 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
819042-98DrillJagged Peak Energy LLCFeb 24, 2017Oct 7, 2016Oct 24, 20167,500
819042-99DrillJagged Peak Energy LLCOct 3, 2016Oct 7, 2016Oct 23, 20167,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-282437————

Formation tops

As filed on W-2/G-1. Subsea from 2,503 ft elevation.Download CSV →

FormationMD ftSubsea
Dockum Aquifer2142,289
Rustler9621,541
Seven Rivers2,000503
Yates3,076-573
Queen3,650-1,147
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO4,200-1,697
Glorieta4,700-2,197
Delaware4,787-2,284
Holt5,500-2,997
Clear ForkCLEARFORK5,600-3,097

Perforations

Perforated and open-hole intervals.

FromToType
4,9606,770Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,26814.751,115 S
7.6257,4479.8751,055 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 5, 2017Jun 27, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

3.15M
bbl, last 12 reported months
32.2M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000115225H-1 InjectionActive20,0002,4004,800–7,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 3,153,687 · prior 12 3,157,334(0%)

0200K400K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47537139, documented in the API reference.