WELL · 42-475-37216 · DISTRICT 8
Longtail SWD #2
Ward County · Abraxas (Cherry Canyon) field · Injection · Vertical
Longtail Swd #2 (API 42-475-37216) is a well in Ward County operated by Pyote Disposal Company, completed December 7, 2018 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued March 27, 2017, permitted to 7,500 ft.
Completion filings report 10 formation tops, including Rustler, Clear Fork, Delaware, Glorieta.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 516K barrels injected in the 12 months reported through July 2025.
Operator of record
Pyote, TX · P-5 Y, filed May 4, 2026 · 3 permits on file · (432) 940-4775
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pyote Disposal Company |
| Production reports | none |
| Latest permit | Pyote Disposal CompanyMar 27, 2017 |
- 7,500
- total depth, ft
- 1
- permits on file
- Mar 27, 2017
- last permit issued
- Dec 7, 2018
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2018 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 7, 2018
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Longtail SWD O-10-51991 | Abraxas (Cherry Canyon) | Pyote Disposal Company | 1 | 0 | 0 | Dec 2018 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 824508-99 | Drill | Pyote Disposal Company | Mar 15, 2017 | Mar 27, 2017 | Nov 18, 2018 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-51991 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Download CSV →
| Formation | MD ft |
|---|---|
| Rustler | 1,300 |
| Clear ForkCLEARFORK | — |
| Delaware | — |
| Glorieta | — |
| Holt | — |
| Queen | — |
| Rustler | — |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | — |
| Seven Rivers | — |
| Tubb | — |
| Yates | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,885 | 6,490 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,931 | 12.25 | 1,191 S |
| 7 | 7,150 | 8.75 | 295 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 3, 2026 | Jan 8, 2026 | — |
| 00 | Aug 27, 2019 | Jul 15, 2019 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-37216 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-37216 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 516K
- bbl, last 12 reported months
- 3.73M
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000115649 | H-1 Injection | Active | 15,000 | 1,462 | 5,850–7,150 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 515,538 · prior 12 459,792(+12%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47537216, documented in the API reference.