WELL · 42-475-38979 · DISTRICT 10
Barbaro 119-120 L #4TS
Ward County · Phantom (Wolfcamp) field · Producing · Horizontal
Barbaro 119-120 L #4TS (API 42-475-38979) is a horizontal well in Ward County operated by Manti Tarka Permian OP LLC, completed December 4, 2025 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 9, 2025, permitted to 11,380 ft.
Completion filings report 10 formation tops, including Rustler, Delaware, Bone Spring, Capitan.
Its lease has reported 41.5K barrels of oil and 81.5K mcf of gas since December 2025, last reporting in July 2026.
Operator of record
Houston, TX · P-5 Y, filed Dec 4, 2025 · 128 permits on file · (866) 831-0199
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Manti Tarka Permian OP LLC |
| Production reports | Manti Tarka Permian OP, LLCthrough Apr 2026 |
| Latest permit | Manti Tarka Permian OP, LLCMay 9, 2025 |
- 11,380
- total depth, ft
- 1
- permits on file
- May 9, 2025
- last permit issued
- Dec 4, 2025
- completed
- 41.5K
- cumulative oil, bbl
- 81.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2025 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 4, 2025
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barbaro 119-120 L O-10-64940 | Phantom (Wolfcamp) | Manti Tarka Permian OP, LLC | 1 | 41.5K | 81.5K | Dec 2025 – Jul 2026 |
Oil, barrels lease total
Last 12 months 41,518 · prior 12 0
Gas, mcf lease total
Last 12 months 81,501 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Manti Tarka Permian OP, LLCDec 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 907812-99 | Drill | Manti Tarka Permian OP, LLC | May 6, 2025 | May 9, 2025 | May 31, 2025 | 11,380 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-64940 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,606 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 913 | 1,693 |
| Delaware | 5,068 | -2,462 |
| Bone Spring3RD BONE SPRING LIME | 10,282 | -7,676 |
| CapitanCAPITAN REEF - HIGH FLOWS | — | — |
| Glorieta | — | — |
| Holt | — | — |
| Queen | — | — |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | — | — |
| Seven Rivers | — | — |
| Yates | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,279 | 21,535 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,430 | 17.5 | 1,035 S |
| 9.625 | 5,551 | 12.25 | 1,420 S |
| 5.5 | 21,565 | 6.75 | 1,470 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 18, 2026 | Apr 8, 2026 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-38979 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-38979 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.