TEXAS · WELLS · WICHITA COUNTY · CORSICANA HONAKER LEASE · API 42-485-40209 · DISTRICT 7C
Corsicana Honaker #33
Wichita County · Wichita County Regular field · Shut In · Vertical
Corsicana Honaker #33 (API 42-485-40209) is a well in Wichita County operated by Waggoner Operating L.L.C., completed March 22, 1997 and listed as shut in on the RRC schedule, shut in January 1, 2005.
The RRC has issued one drilling permit, issued December 14, 1984, permitted to 3,450 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.
Completion filings report 4 formation tops, including Coleman Junction, Megargle Limestone, Canyon, Ellenburger.
Its lease has reported 57.7K barrels of oil and 10.1K mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Vernon, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 31, 2026
- Permits on file
- 80
- Phone
- (940) 552-2521
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Waggoner Operating L.L.C. |
| Production reports | Waggoner Operating, L.L.C.through Apr 2026 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Dec 14, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,450
- total depth, ft
- 1
- permits on file
- Dec 14, 1984
- last permit issued
- Mar 22, 1997
- completed
- 57.7K
- cumulative oil, bbl
- 10.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 22, 1997
- Shut in
- Jan 1, 2005
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Corsicana Honaker O-13-5305 | Wichita County Regular | Waggoner Operating, L.L.C. | 3 | 57.7K | 10.1K | Jan 1993 – Apr 2026 |
Oil, barrels lease total
Last 12 months 102 · prior 12 186(-45%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Coda Energy, Inc.Jan 1993 → Aug 1998
- 2Belco Energy Corp.Sep 1998 → Jul 2000
- 3WG Operating, Inc.Aug 2000 → May 2012
- 4Halcon Operating Co., Inc.Jun 2012 → Oct 2013
- 5Layline Energy I LLCNov 2013 → Dec 2019
- 6Vinland Texas Services LLCJan 2020 → Dec 2023
- 7Dara Operating Company, LLCMay 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 261240-99 | Drill | Mobil Producing TX. & N.M. Inc. | Oct 10, 1985 | Dec 14, 1984 | Jan 24, 1985 | 3,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 22, 1997 | Corsicana Honaker O-13-5305 | Wichita County Regular | Waggoner Operating L.L.C. | Shut In · shut in Jan 1, 2005 | 3,450 |
Formation tops
As filed on W-2/G-1. Subsea from 1,146 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 714 | 432 |
| Megargle Limestone | 1,784 | -638 |
| CanyonCANYON LIMESTONE | 2,297 | -1,151 |
| Ellenburger | 3,071 | -1,925 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,871 | 1,881 | Perforated |
| 1,878 | 1,884 | Perforated |
| 1,918 | 1,930 | Perforated |
| 1,986 | 1,994 | Perforated |
| 2,028 | 2,038 | Perforated |
| 2,110 | 2,112 | Perforated |
| 2,306 | 2,591 | Perforated |
| 2,306 | 2,591 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 122 | 14.75 | 125 S |
| 7 | 3,449 | 9.875 | 1,200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 12, 2003 | Jun 16, 2003 | — |
| 00 | Apr 16, 1997 | Apr 3, 1997 | — |
| 00 | Nov 29, 1995 | Oct 30, 1995 | — |
| 00 | Nov 21, 1985 | Oct 28, 1985 | — |
| 00 | Nov 9, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-40209 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-40209 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48540209, documented in the API reference.