TEXAS · WELLS · WICHITA COUNTY · CORSICANA HONAKER LEASE · API 42-485-41273 · DISTRICT 7C

Corsicana Honaker #38

Y

Wichita County · Wichita County Regular field · Shut In  · Vertical

Corsicana Honaker #38 (API 42-485-41273) is a well in Wichita County operated by Waggoner Operating L.L.C., completed August 4, 2025 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued February 9, 1987, permitted to 3,158 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.

Completion filings report 5 formation tops, including Cisco, Coleman Junction, Megargel Limestone, Canyon.

Its lease has reported 57.7K barrels of oil and 10.1K mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 105K barrels injected in the 12 months reported through May 2025.

Operator of record

Waggoner Operating L.L.C.

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Vernon, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
80
Phone
(940) 552-2521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Operating L.L.C.
Production reportsWaggoner Operating, L.L.C.through Apr 2026
Latest permitMobil Producing TX. & N.M. Inc.Feb 9, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,158
total depth, ft
1
permits on file
Feb 9, 1987
last permit issued
Aug 4, 2025
completed
57.7K
cumulative oil, bbl
10.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 4, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Corsicana Honaker O-13-5305Wichita County RegularWaggoner Operating, L.L.C.357.7K10.1KJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 102 · prior 12 186(-45%)

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Coda Energy, Inc.Jan 1993 → Aug 1998
  2. 2Belco Energy Corp.Sep 1998 → Jul 2000
  3. 3WG Operating, Inc.Aug 2000 → May 2012
  4. 4Halcon Operating Co., Inc.Jun 2012 → Oct 2013
  5. 5Layline Energy I LLCNov 2013 → Dec 2019
  6. 6Vinland Texas Services LLCJan 2020 → Dec 2023
  7. 7Dara Operating Company, LLCMay 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
326111-99DrillMobil Producing TX. & N.M. Inc.Feb 3, 1987Feb 9, 1987Mar 24, 19873,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 4, 2025Corsicana Honaker O-13-5305Wichita County RegularWaggoner Operating L.L.C.Shut In3,158
Aug 11, 1987Corsicana Honaker O-13-5305Wichita County RegularWaggoner Operating L.L.C.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,144 ft elevation.Download CSV →

FormationMD ftSubsea
Cisco500644
Coleman Junction740404
Megargel Limestone1,790-646
CanyonCANYON LIMESTONE2,315-1,171
Ellenburger3,102-1,958

Perforations

Perforated and open-hole intervals.

FromToType
1,0472,322Perforated
2,0712,198Perforated
2,3172,322Perforated
2,5602,569Perforated
2,5602,812Perforated
2,5782,582Perforated
2,5942,603Perforated
2,6102,614Perforated
2,6962,700Perforated
2,7212,729Perforated
2,7602,768Perforated
2,8042,812Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62517412.25150 S
8.62518412.25150 S
5.53,1467.8751,436 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 12, 2025Aug 5, 2025—
00Jul 22, 2020May 8, 2020—
00Jun 7, 2018Jun 6, 2018—
00Feb 3, 2015Sep 6, 2012—
00Jun 10, 2002Jan 18, 2001—
00Sep 7, 1988Aug 24, 1988—
00Sep 1, 1988Oct 1, 1987Yes
00Oct 15, 1987Oct 1, 1987Yes
00Oct 7, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

105K
bbl, last 12 reported months
7.74M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000066617H-1 InjectionActive1,0008001,047–2,812

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 104,866 · prior 12 83,279(+26%)

010K20K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48541273, documented in the API reference.