WELL · 42-485-44137 · DISTRICT 9

Waggoner - Aurora #A 2

Y

Wichita County · Waggoner S. Electra (Milham) field · Producing  · Vertical

Waggoner - Aurora #A 2 (API 42-485-44137) is a well in Wichita County operated by Covenant Operating LLC, completed September 15, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued August 3, 2006, permitted to 3,475 ft.

It was permitted by Waggoner, W. T., Estate and has since transferred to Covenant Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Upper Milham Marker, Milham Sand, Canyon, Kma 2.

Its lease has reported 259K barrels of oil since November 2006, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Covenant Operating LLC

Permitted by Waggoner, W. T., Estate; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Mar 11, 2026
Permits on file
85
Phone
(940) 687-5325

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCovenant Operating LLC
Production reportsCovenant Operating, LLCthrough Apr 2026
Latest permitWaggoner, W. T., EstateAug 3, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,475
total depth, ft
2
permits on file
Aug 3, 2006
last permit issued
Sep 15, 2006
completed
259K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 15, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Waggoner - Aurora O-13-30772Waggoner, S. Electra (Milham)Covenant Operating, LLC4259K0Nov 2006 – Jul 2026

Oil, barrels lease total

Last 12 months 4,713 · prior 12 5,341(-12%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Waggoner, W. T., EstateNov 2006 → Mar 2016
  2. 2W.T. Waggoner Estate, Inc.Apr 2016 → Oct 2018
  3. 3Covenant Operating, LLCNov 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
623450-98DrillWaggoner, W. T., EstateJan 25, 2007Aug 3, 2006Aug 28, 20064,000
623450-99DrillWaggoner, W. T., EstateJul 28, 2006Aug 3, 2006Aug 28, 20064,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 15, 2006Waggoner - Aurora O-13-30772Waggoner S. Electra (Milham)Covenant Operating LLCProducing3,475

Formation tops

As filed on W-2/G-1. Subsea from 1,148 ft elevation.Download CSV →

FormationMD ftSubsea
Upper Milham Marker2,092-944
Milham Sand2,096-948
CanyonCANYON REEF2,429-1,281
Kma 23,314-2,166
CaddoCADDO LIME3,364-2,216

Perforations

Perforated and open-hole intervals.

FromToType
2,0962,104Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6258512.2575 S
5.52,3017.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 2007Nov 16, 2006Yes
00Jun 12, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.