TEXAS · WELLS · WICHITA COUNTY · SKINNER, GEO. S. LEASE · API 42-485-44776 · DISTRICT 7C

Skinner Geo. S. #189

Y

Wichita County · Wichita County (Special) field · Injection  · Vertical

Skinner Geo. S. #189 (API 42-485-44776) is a well in Wichita County operated by Waggoner Operating L.L.C., completed June 4, 2024 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued September 23, 2009, permitted to 2,206 ft.

It was permitted by WG Operating, Inc. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.

Completion filings report 4 formation tops, including Cisco, Thomas Sand, Gunsight, Canyon.

Its lease has reported 208K barrels of oil and 379K mcf of gas since December 2008, last reporting volume in April 2026. The lease carries 35 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 128K barrels injected in the 12 months reported through April 2026.

Operator of record

Waggoner Operating L.L.C.

Permitted by WG Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Vernon, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
82
Phone
(940) 552-2521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Operating L.L.C.
Production reportsWaggoner Operating, L.L.C.through Apr 2026
Latest permitWG Operating, Inc.Sep 23, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,206
total depth, ft
1
permits on file
Sep 23, 2009
last permit issued
Jun 4, 2024
completed
208K
cumulative oil, bbl
379K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 4, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 35 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Skinner, Geo. S. O-13-31171Wichita County (Special)Waggoner Operating, L.L.C.35208K379KDec 2008 – Apr 2026

Oil, barrels lease total

Last 12 months 4,807 · prior 12 8,880(-46%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 14,952 · prior 12 13,578(+10%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WG Operating, Inc.Dec 2008 → May 2012
  2. 2Halcon Operating Co., Inc.Jun 2012 → Oct 2013
  3. 3Layline Energy I LLCNov 2013 → Dec 2019
  4. 4Vinland Texas Services LLCJan 2020 → Feb 2024
  5. 5Dara Operating Company, LLCMar 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
685444-99DrillWG Operating, Inc.Sep 23, 2009Sep 23, 2009Oct 15, 20092,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 4, 2024Skinner Geo. S. O-13-31171Wichita County (Special)Waggoner Operating L.L.C.Injection2,206

Formation tops

As filed on W-2/G-1. Subsea from 1,178 ft elevation.Download CSV →

FormationMD ftSubsea
Cisco1,486-308
Thomas Sand1,662-484
GunsightGUNSIGHT SAND1,790-612
GunsightGUNSIGHT LIME1,850-672
Canyon2,000-822

Perforations

Perforated and open-hole intervals.

FromToType
1,4861,494Perforated
1,5401,550Perforated
1,6621,670Perforated
1,7081,712Perforated
1,7361,740Perforated
1,7941,826Perforated
1,9101,920Perforated
2,0562,080Perforated
2,1152,130Perforated
2,1402,160Perforated
2,1702,180Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256512.2560 S
5.52,1987.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 15, 2024Jun 6, 2024—
00Apr 10, 2024Mar 22, 2024—
00May 20, 2022May 4, 2022—
00Feb 10, 2010Nov 23, 2009Yes
00Feb 5, 2010——

Well logs

1 log loaded from the RRC's log index, the latest received Feb 24, 2010. Density, Neutron. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
NEUTRON/DENSITY POROSITYSpans Cisco, Thomas Sand, Gunsight, CanyonTIFF80 to 2,176Feb 24, 2010run Oct 22, 20090.90

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

128K
bbl, last 12 reported months
238K
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000126575H-1 InjectionActive4507351,486–2,180

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 127,666 · prior 12 110,625(+15%)

05K10K15K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48544776, documented in the API reference.