TEXAS · WELLS · WICHITA COUNTY · ALLEN, R. S. LEASE · API 42-485-44988 · DISTRICT 7C

Allen R. S. #270

On schedule

Wichita County · Wichita County (Special) field · Producing  · Vertical

Allen R. S. #270 (API 42-485-44988) is a well in Wichita County operated by Waggoner Operating L.L.C., completed August 29, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 6, 2010, permitted to 2,050 ft.

It was permitted by WG Operating, Inc. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.

Completion filings report 3 formation tops, including Thomas Sand, Canyon, Gunsight.

Its lease has reported 1.26M barrels of oil and 813K mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 162 wells, so these are lease totals, not this well alone.

Operator of record

Waggoner Operating L.L.C.

Permitted by WG Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Vernon, TX
P-5 status
Active (A)
P-5 last filed
Mar 31, 2026
Permits on file
82
Phone
(940) 552-2521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWaggoner Operating L.L.C.
Production reportsWaggoner Operating, L.L.C.through Apr 2026
Latest permitWG Operating, Inc.Dec 6, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,050
total depth, ft
1
permits on file
Dec 6, 2010
last permit issued
Aug 29, 2018
completed
1.26M
cumulative oil, bbl
813K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 29, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 162 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Allen, R. S. O-13-26755Wichita County (Special)Waggoner Operating, L.L.C.1621.26M813KJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 12,400 · prior 12 13,715(-10%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 22,355 · prior 12 20,807(+7%)

01K2K3K202420252026

Wells named Allen R. S.

Waggoner Operating L.L.C.'s other wells filed under this lease name in Wichita County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Coda Energy, Inc.Jan 1993 → Aug 1998
  2. 2Belco Energy Corp.Sep 1998 → Jul 2000
  3. 3WG Operating, Inc.Aug 2000 → May 2012
  4. 4Halcon Operating Co., Inc.Jun 2012 → Oct 2013
  5. 5Layline Energy I LLCNov 2013 → Dec 2019
  6. 6Vinland Texas Services LLCJan 2020 → Feb 2024
  7. 7Dara Operating Company, LLCMar 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
706238-99DrillWG Operating, Inc.Dec 2, 2010Dec 6, 2010Dec 3, 20102,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 29, 2018Allen R. S. O-13-26755Wichita County (Special)Waggoner Operating L.L.C.Producing2,050

Formation tops

As filed on W-2/G-1. Subsea from 1,172 ft elevation.Download CSV →

FormationMD ftSubsea
Thomas Sand1,625-453
Canyon1,900-728
GunsightGUNSIGHT SAND1,910-738
GunsightGUNSIGHT LIME1,969-797

Perforations

Perforated and open-hole intervals.

FromToType
1,3261,332Perforated
1,3701,382Perforated
1,5081,518Perforated
1,8441,856Perforated
1,9081,928Perforated
1,9881,992Perforated
2,0002,012Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6256512.2560 S
5.52,0487.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 7, 2018Sep 13, 2018—
00Apr 5, 2017Mar 10, 2017—
00Jul 28, 2011Jan 13, 2011Yes

Well logs

1 log loaded from the RRC's log index, the latest received Aug 15, 2011. Density, Neutron. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
NEUTRON/DENSITY POROSITYSpans Thomas Sand, Canyon, GunsightTIFF100 to 2,031Aug 15, 2011run Dec 9, 20101.33

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/48544988, documented in the API reference.