TEXAS · WELLS · WICHITA COUNTY · CATO LEASE · API 42-485-45977 · DISTRICT 7C
Cato #1
Wichita County · Cash (Strawn 3820) field · Shut In · Vertical
Cato #1 (API 42-485-45977) is a well in Wichita County operated by R2q Operating LLC, completed December 29, 2016 and listed as shut in on the RRC schedule, shut in May 1, 2018.
The RRC has issued one drilling permit, issued November 8, 2016, permitted to 4,103 ft.
Completion filings report 9 formation tops, including Gunsight, Canyon, Bluff Creek Sand, KMA.
Its lease has reported 1.76K barrels of oil since December 2016, with no volume in the three years through April 2026.
Operator of record
- Based in
- Iowa Park, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Sep 12, 2025
- Permits on file
- 38
- Phone
- (940) 228-1500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | R2Q Operating LLC |
| Production reports | R2Q Operating LLCthrough Mar 2018 |
| Latest permit | R2Q Operating LLCNov 8, 2016 |
- 4,103
- total depth, ft
- 1
- permits on file
- Nov 8, 2016
- last permit issued
- Dec 29, 2016
- completed
- 1.76K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2017 THROUGH Mar 2018
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 29, 2016
- Shut in
- May 1, 2018
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cato O-13-33640 | Cash (Strawn 3820) | R2Q Operating LLC | 1 | 1.76K | 0 | Dec 2016 – Mar 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1R2Q Operating LLCJan 2017 → Mar 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 819824-99 | Drill | R2Q Operating LLC | Oct 27, 2016 | Nov 8, 2016 | Nov 15, 2016 | 4,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 29, 2016 | Cato O-13-33640 | Cash (Strawn 3820) | R2Q Operating LLC | Shut In · shut in May 1, 2018 | 4,103 |
Formation tops
As filed on W-2/G-1. Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,842 | 3,846 | Perforated |
| 3,964 | 3,972 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 63 | 12.25 | 75 S |
| 5.5 | 4,094 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 23, 2017 | Apr 24, 2017 | Yes |
Well logs
The RRC's map lists this well among those with logs online. Its monthly inventories loaded here, which start in July 2006, list none for it, so none are itemized.
Open the RRC's log search for this well ↗The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-45977 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-45977 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48545977, documented in the API reference.