WELL · 42-485-87132 · DISTRICT 9
Pace J. R. #28
Wichita County · K-M-A (Canyon 2800) field · Vertical
Pace J. R. #28 (API 42-485-87132) is a plugged well in Wichita County, plugged November 18, 2019, last operated by Urban Oil & Gas Group LLC.
The RRC has issued one drilling permit, issued June 16, 1986, permitted to 3,681 ft.
It was permitted by Catlin, Delbert and has since transferred to Urban Oil & Gas Group LLC on the wellbore schedule.
Completion filings report one formation top, including Canyon.
Its lease has reported 9.13K barrels of oil and 21 mcf of gas since January 1993, last reporting in September 2022.
Operator of record
Permitted by Catlin, Delbert; the EWA schedule now lists a different operator.
- Based in
- Plano, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 3, 2025
- Permits on file
- 140
- Phone
- (972) 543-8800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Urban Oil & Gas Group LLC |
| Production reports | Urban Oil & Gas Group, LLCthrough May 2018 |
| Latest permit | Catlin, DelbertJun 16, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,681
- total depth, ft
- 1
- permits on file
- Jun 16, 1986
- last permit issued
- Apr 26, 1986
- completed
- 9.13K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2022
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 26, 1986
- Shut in
- —
- Plugged
- Nov 18, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pace, J. R. O-13-26264 | K-M-A (Canyon 2800) | Urban Oil & Gas Group, LLC | 1 | 9.13K | 21 | Jan 1993 – Sep 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Catlin, DelbertJan 1993 → Oct 2010
- 2Bto Venture, Inc.Nov 2010 → Nov 2012
- 3Urban Oil & Gas Group, LLCDec 2012 → May 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 303257-99 | Recompletion | Catlin, Delbert | May 23, 1986 | Jun 16, 1986 | — | 3,681 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 26, 1986 | Pace J. R. O-13-26264 | K-M-A (Canyon 2800) | Urban Oil & Gas Group LLC | Plugged | — |
| — | Pace J. R. O-13-6294 | K-M-A | R2Q Operating LLC | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,823 | 2,828 | Perforated |
| — | 3,690 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 110 | 13.75 | 50 S |
| 6.625 | 3,681 | 8.75 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 4, 1986 | May 6, 1986 | Yes |
| 00 | Jul 25, 1986 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-485-87132 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-485-87132 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48587132, documented in the API reference.