TEXAS · WELLS · WILBARGER COUNTY · SUMNER, FRANCES LEASE · API 42-487-31845 · DISTRICT 7C
Sumner Frances #169
Wilbarger County · Electra West (Rock Crossing) field · Producing · Vertical
Sumner Frances #169 (API 42-487-31845) is a well in Wilbarger County operated by Waggoner Operating L.L.C., completed March 14, 2013 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 1984 and 1989, permitted to 2,918 ft.
It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Waggoner Operating L.L.C. on the wellbore schedule.
Completion filings report 4 formation tops, including Coleman Junction, Megargle Limestone, Canyon, Rock Crossing.
Its lease has reported 33.1K barrels of oil and 61.1K mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.
- Based in
- Vernon, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 31, 2026
- Permits on file
- 81
- Phone
- (940) 552-2521
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Waggoner Operating L.L.C. |
| Production reports | Waggoner Operating, L.L.C.through Apr 2026 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Nov 20, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,918
- total depth, ft
- 2
- permits on file
- Nov 20, 1989
- last permit issued
- Mar 14, 2013
- completed
- 33.1K
- cumulative oil, bbl
- 61.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 14, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sumner, Frances O-13-22634 | Electra, West (Rock Crossing) | Waggoner Operating, L.L.C. | 2 | 33.1K | 61.1K | Jan 1993 – Apr 2026 |
Gas, mcf lease total
Last 12 months 8,455 · prior 12 6,994(+21%)
Oil, barrels lease total
Last 12 months 608 · prior 12 978(-38%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Coda Energy, Inc.Jan 1993 → Aug 1998
- 2Belco Energy Corp.Sep 1998 → Jun 2000
- 3WG Operating, Inc.Nov 2000 → May 2012
- 4Halcon Operating Co., Inc.Jun 2012 → Oct 2013
- 5Layline Energy I LLCNov 2013 → Dec 2019
- 6Vinland Texas Services LLCJan 2020 → Feb 2024
- 7Dara Operating Company, LLCMar 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 366611-99 | Other | Mobil Producing TX. & N.M. Inc. | Nov 17, 1989 | Nov 20, 1989 | — | 3,000 |
| 259876-99 | Drill | Mobil Producing TX. & N.M. Inc. | Nov 26, 1984 | Dec 5, 1984 | Jan 15, 1985 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 14, 2013 | Sumner Frances O-13-22634 | Electra West (Rock Crossing) | Waggoner Operating L.L.C. | Producing | 2,918 |
| Mar 14, 2013 | Sumner Frances O-13-22634 | Electra West (Rock Crossing) | Waggoner Operating L.L.C. | Producing | 2,918 |
Formation tops
As filed on W-2/G-1. Subsea from 1,209 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 640 | 569 |
| Megargle Limestone | 1,768 | -559 |
| CanyonCANYON LIME | 2,132 | -923 |
| CanyonCANYON LIMESTONE | 2,132 | -923 |
| Rock Crossing | 2,690 | -1,481 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 531 | 546 | Perforated |
| 531 | 2,064 | Perforated |
| 531 | 2,064 | Open hole |
| 1,035 | 1,059 | Perforated |
| 1,611 | 1,614 | Perforated |
| 1,692 | 1,697 | Perforated |
| 1,710 | 1,751 | Perforated |
| 1,751 | 1,755 | Perforated |
| 1,769 | 1,776 | Perforated |
| 1,829 | 1,837 | Perforated |
| 1,851 | 1,857 | Perforated |
| 1,864 | 1,869 | Perforated |
| 1,955 | 1,965 | Perforated |
| 1,976 | 1,983 | Perforated |
| 2,028 | 2,030 | Perforated |
| 2,047 | 2,051 | Perforated |
| 2,058 | 2,064 | Perforated |
| 2,065 | 2,072 | Perforated |
| 2,692 | 2,712 | Perforated |
| 2,692 | 2,750 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 198 | 12.25 | 125 S |
| 8.625 | 198 | — | — |
| 5.5 | 2,899 | 7.875 | 750 S |
| 5.5 | 2,899 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 2014 | Aug 6, 2014 | — |
| 00 | Aug 5, 1991 | Apr 26, 1990 | — |
| 00 | May 14, 1991 | — | — |
| 00 | Mar 11, 1987 | Feb 17, 1987 | — |
| 00 | Apr 3, 1985 | Mar 25, 1985 | — |
| 00 | Apr 2, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-487-31845 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-487-31845 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/48731845, documented in the API reference.