WELL · 42-495-03476 · DISTRICT 8

Walton -A- #1

N

Winkler County · Kermit (Grayburg) field  · Vertical

Walton -A- #1 (API 42-495-03476) is a former disposal or injection well in Winkler County, last operated by G P II Energy Inc.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued September 26, 1990, permitted to 3,360 ft.

Completion filings report 6 formation tops, including Rustler, Salt, Yates, Colby.

Its 3 leases have reported 367 barrels of oil and 96.4K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

G P II Energy Inc.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Jun 3, 2020
Permits on file
72
Phone
(432) 684-4748

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleG P II Energy Inc.
Production reportsBurns, Gene Oil & Gasthrough Oct 2019
Latest permitG P II Energy, Inc.Sep 26, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,360
total depth, ft
1
permits on file
Sep 26, 1990
last permit issued
—
completed
367
cumulative oil, bbl
96.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walton -A- G-10-20176Kermit (Yates)A&m Oil & Gas LLC1096.4KJan 1993 – Jul 2026
Walton A O-10-33202KermitA&m Oil & Gas LLC136721Jan 1993 – Jul 2026
— O-10-17022——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1G P II Energy, Inc.Jan 1993 → Oct 2005
  2. 2Burns, Gene Oil & GasFeb 2008 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
378419-99RecompletionG P II Energy, Inc.Sep 24, 1990Sep 26, 1990Mar 5, 19913,360

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-20176————
—— O-10-17022————
—— O-10-33202————

Formation tops

As filed on W-2/G-1. Subsea from 2,890 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler9201,970
Salt2,200690
Yates2,420470
Colby2,900-10
Queen2,960-70
Grayburg3,240-350

Perforations

Perforated and open-hole intervals.

FromToType
2,9643,149Perforated
3,2463,294Perforated
—3,234Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.625458——
8.62547912.25450 S
8.62547912.5450 S
2.8753,350——
2.8753,359——
2.8753,3607.875684 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 1991Jun 19, 1991Yes
00Jul 5, 1991Sep 27, 1989—
00Nov 21, 1989Sep 27, 1989—
00Jan 12, 1984Aug 6, 1962—
00Jan 12, 1984Aug 1, 1962—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jun 1991
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000016634UIC PermitCanceled Apr 6, 19921,0005003,246–3,294

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0119901991

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49503476, documented in the API reference.