TEXAS · WELLS · WINKLER COUNTY · API 42-495-03712 · DISTRICT 7B

Bashara M. J. #36

Shut in

Winkler County · Keystone (San Andres) field · Shut In  · Vertical

Bashara M. J. #36 (API 42-495-03712) is a well in Winkler County operated by Hilcorp Energy Company, completed November 9, 2018 and listed as shut in on the RRC schedule, shut in March 1, 2020.

The RRC has issued one drilling permit, issued January 3, 1994, permitted to 8,409 ft.

It was permitted by Bass Enterprises Production CO. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.

Its 2 leases have reported 6.49M barrels of oil and 13.6M mcf of gas since January 1993, last reporting in July 2026. The leases carry 171 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Permitted by Bass Enterprises Production Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBopco L.P.
Production reportsBopco, L.P.through Aug 2015
Latest permitBass Enterprises Production Co.Jan 3, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,409
total depth, ft
1
permits on file
Jan 3, 1994
last permit issued
Nov 9, 2018
completed
6.49M
cumulative oil, bbl
13.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 9, 2018
Shut in
Mar 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 171 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bashara, M. J. O-10-28522Keystone (San Andres)Hilcorp Energy Company700Jan 1993 – Jul 2026
Keystone Holt Unit O-10-20730Keystone (Holt)Bopco, L.P.1646.49M13.6MJan 1993 – Jan 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bass Enterprises Production Co.Jan 1993 → Dec 2006
  2. 2Bepco, L.P.Jan 2007 → Nov 2008
  3. 3Bopco, L.P.Dec 2008 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431528-99RecompletionBass Enterprises Production Co.Jan 3, 1995Jan 3, 1994Nov 15, 19948,409

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 9, 2018Bashara M. J. O-10-28522Keystone (San Andres)Hilcorp Energy CompanyShut In · shut in Mar 1, 20208,409
—Keystone Holt Unit O-10-20730Keystone (Holt)Bopco L.P.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,973 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres3,891-918
Glorieta4,680-1,707
Clear ForkUPPER CLEARFORK4,890-1,917

Perforations

Perforated and open-hole intervals.

FromToType
4,0104,040Perforated
4,0804,110Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37534617.5342 S
9.6253,60312.252,300 S
78,0248.751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 30, 2019Nov 13, 2018—
00Mar 24, 1995Jan 13, 1995Yes
00Mar 6, 1995——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
28.8M
bbl, all reported
Aug 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082001H-1 InjectionActive20,0001,7503,850–4,120

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.