TEXAS · WELLS · WINKLER COUNTY · WALTON, J. B. LEASE · API 42-495-32212 · DISTRICT 7B

Walton J. B. #330

Shut in

Winkler County · Kermit (Yates) field · Temp Abandoned  · Vertical

Walton J. B. #330 (API 42-495-32212) is a well in Winkler County operated by Formentera Operations LLC, completed September 26, 1988 and listed as temp abandoned on the RRC schedule, shut in February 1, 2023.

The RRC has issued one drilling permit, issued August 26, 1988, permitted to 2,800 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Formentera Operations LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Rustler, Salado, Tansill, Yates.

Its lease has reported 12 barrels of oil and 409K mcf of gas since the record begins in January 1993, with no volume in the three years through August 2026.

Operator of record

Formentera Operations LLC

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active (A)RRC P-5 file of Nov 18, 2026
P-5 last filed
Jun 11, 2026
Permits on file
96
Phone
(512) 514-5779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFormentera Operations LLC
Production reportsFormentera Operations LLCthrough Jan 2023
Latest permitMobil Producing TX. & N.M. Inc.Aug 26, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,800
total depth, ft
1
permits on file
Aug 26, 1988
last permit issued
Sep 26, 1988
completed
12
cumulative oil, bbl
409K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH JAN 2023

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 26, 1988
Shut in
Feb 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walton, J. B. G-10-128948Kermit (Yates)Formentera Operations LLC112409Kby Jan 1993 – Jan 2023

No volumes reported on these leases in the last three years.

Wells named Walton J. B.

Formentera Operations LLC's other wells filed under this lease name in Winkler County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Operator on the lease's P-4

Each operator named on the P-4 filings for this well's lease (a gas well is its own lease), from the date its filing took effect. The P-4 is filed by lease, so a date before the well was drilled is the lease's.

OperatorFromTo
Formentera Operations LLCMay 7, 2024today
Saddleback Exploration, LLCJun 1, 2021May 7, 2024
Blackbeard Operating, LLCDec 16, 2016Jun 1, 2021
Merit Energy CompanyJan 1, 2013Dec 16, 2016
Cimarex Energy Co. of ColoradoMay 1, 2006Jan 1, 2013
Gruy Petroleum Management Co.Apr 1, 2002May 1, 2006
Prize Operating CompanyJul 1, 1999Apr 1, 2002
Pioneer Natural Res. USA, Inc.Sep 1, 1997Jul 1, 1999
Parker & Parsley Development L.PMar 1, 1995Sep 1, 1997
Midpar L.P.Jan 1, 1993Mar 1, 1995
Parker & Parsley Development Co.Jan 1, 1993Jan 1, 1993
Mobil Producing TX. & N.M. Inc.Nov 29, 1988Jan 1, 1993

Reporting production

Every operator that reported production on this well's lease, in order.

  1. 1Midpar L.P.Jan 1993 → Feb 1995
  2. 2Parker & Parsley Development L.PMar 1995 → Feb 1997
  3. 3Pioneer Natural Res. USA, Inc.Dec 1997 → Jun 1999
  4. 4Prize Operating CompanyJul 1999 → Mar 2002
  5. 5Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  6. 6Cimarex Energy Co. of ColoradoMay 2006 → Dec 2012
  7. 7Merit Energy CompanyJan 2013 → Nov 2016
  8. 8Blackbeard Operating, LLCDec 2016 → May 2021
  9. 9Saddleback Exploration, LLCJul 2021 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
350548-99DrillMobil Producing TX. & N.M. Inc.Aug 26, 1988Aug 26, 1988Aug 30, 19882,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 26, 1988Walton J. B. G-10-128948Kermit (Yates)Formentera Operations LLCTemp Abandoned · shut in Feb 1, 20232,800

Formation tops

As filed on W-2/G-1. Subsea from 2,951 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler8682,083
Salado1,0861,865
Tansill2,350601
Yates2,592359
Seven Rivers2,766185

Perforations

Perforated and open-hole intervals.

FromToType
2,6202,754Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62561012.25400 S
5.52,8009.25500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 1, 1988Oct 24, 1988Yes
00Nov 29, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49532212, documented in the API reference.