WELL · 42-495-33663 · DISTRICT 8

Campbell Seth #92

N

Winkler County · Keystone (Clear Fork) field  · Vertical

Campbell Seth #92 (API 42-495-33663) is a well in Winkler County operated by Apache Corporation, completed May 20, 2015.

The RRC has issued one drilling permit, issued January 30, 2015, permitted to 6,900 ft.

Completion filings report 10 formation tops, including Rustler, Yates, Queen, Colby-Queen.

Its 2 leases have reported 4.97M barrels of oil and 21.1M mcf of gas since January 1993, last reporting in July 2026. The leases carry 145 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Houston, TX · P-5 Y, filed Oct 4, 2025 · 9,754 permits on file · (713) 296-6400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitApache CorporationJan 30, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
1
permits on file
Jan 30, 2015
last permit issued
May 20, 2015
completed
4.97M
cumulative oil, bbl
21.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 2015
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 145 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Campbell, Seth O-10-47618Keystone (Consolidated)Hilcorp Energy Company782.81M11.6MSep 2015 – Jul 2026
Campbell, Seth O-10-13866Keystone (Clear Fork)Apache Corporation672.16M9.47MJan 1993 – Aug 2016

Oil, barrels lease total

Last 12 months 94,117 · prior 12 110,759(-15%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 361,095 · prior 12 409,951(-12%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Feb 1995
  2. 2Apache CorporationMar 1995 → Nov 2024
  3. 3Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
802097-99DrillApache CorporationDec 22, 2014Jan 30, 2015Feb 26, 20156,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-13866————
—— O-10-47618————

Formation tops

As filed on W-2/G-1. Subsea from 2,896 ft elevation.Download CSV →

FormationMD ftSubsea
RustlerRUSTLER - POSSIBLE FLOW; POSSIBL9131,983
Yates2,278618
QueenQUEEN-SEVEN RIVERS2,701195
Colby-Queen3,239-343
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO3,699-803
Glorieta4,786-1,890
Holt4,786-1,890
Clear ForkCLEARFORK5,108-2,212
Wichita-AlbanyWICHITA ALBANY6,306-3,410
Delaware——

Perforations

Perforated and open-hole intervals.

FromToType
5,1225,200Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37555017.5420 S
8.6251,25011450 S
5.56,9127.8751,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 8, 2024Apr 22, 2024—
00May 27, 2016Aug 5, 2015Yes
00Aug 20, 2015Aug 5, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49533663, documented in the API reference.