TEXAS · WELLS · WINKLER COUNTY · UNIVERSITY BLK 20 LEASE · API 42-495-33754 · DISTRICT 7B

University BLK 20 #1399

Y

Winkler County · Two Georges (Bone Spring) field · Injection  · Vertical

University Blk 20 #1399 (API 42-495-33754) is a well in Winkler County operated by Xto Energy Inc., completed April 22, 2017 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 12, 2016, permitted to 6,656 ft.

Completion filings report 10 formation tops, including Rustler, Salado, Castile, Lamar.

Its lease has reported 3.31M barrels of oil and 3.44M mcf of gas since December 2011, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 486K barrels injected in the 12 months reported through April 2025.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Oct 12, 2016
6,656
total depth, ft
1
permits on file
Oct 12, 2016
last permit issued
Apr 22, 2017
completed
3.31M
cumulative oil, bbl
3.44M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 22, 2017
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University BLK 20 O-10-42354Two Georges (Bone Spring)XTO Energy Inc.123.31M3.44MDec 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 125,335 · prior 12 106,360(+18%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 301,711 · prior 12 92,022(+228%)

020K40K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Dec 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
819249-99DrillXTO Energy Inc.Oct 10, 2016Oct 12, 2016Jan 5, 20176,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 22, 2017University BLK 20 O-10-42354Two Georges (Bone Spring)XTO Energy Inc.Injection6,656

Formation tops

As filed on W-2/G-1. Subsea from 2,810 ft elevation.Download CSV →

FormationMD ftSubsea
RustlerRUSTLER - POSSIBLE FLOW; POSSIBL7782,032
Salado1,1361,674
Castile3,042-232
Lamar5,152-2,342
Bell Canyon5,194-2,384
Cherry Canyon6,188-3,378
Colby-Queen——
QueenQUEEN-SEVEN RIVERS——
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO——
Yates——

Perforations

Perforated and open-hole intervals.

FromToType
5,2006,512Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,05112.25495 S
76,6568.751,140 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2017Jun 5, 2017—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

486K
bbl, last 12 reported months
7.22M
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000114864H-1 InjectionActive15,0002,5505,100–6,656

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 486,428 · prior 12 420,365(+16%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49533754, documented in the API reference.