TEXAS · WELLS · YOAKUM COUNTY · WILLARD "A" LEASE · API 42-501-31467 · DISTRICT 7B

Willard A #6

Y

Yoakum County · Wasson 72 field · Producing  · Vertical

Willard A #6 (API 42-501-31467) is a well in Yoakum County operated by Occidental Permian Ltd., completed August 7, 2025 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 9, 1977, permitted to 6,870 ft.

It was permitted by Mabee Petroleum Corp. and has since transferred to Occidental Permian Ltd. on the wellbore schedule.

Completion filings report 3 formation tops, including Rustler, Tansill, Yates.

Its lease has reported 221K barrels of oil and 62.4K mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Occidental Permian Ltd.

Permitted by Mabee Petroleum Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Permits on file
6,251
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOccidental Permian Ltd.
Production reportsOccidental Permian Ltd.through Apr 2026
Latest permitMabee Petroleum Corp.Aug 9, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,870
total depth, ft
1
permits on file
Aug 9, 1977
last permit issued
Aug 7, 2025
completed
221K
cumulative oil, bbl
62.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 7, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Willard "A" O-11-61080Wasson 72Occidental Permian Ltd.3221K62.4KJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 3,625 · prior 12 4,641(-22%)

05001K202420252026

Gas, mcf lease total

Last 12 months 409 · prior 12 197(+108%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&P Inc.Jan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
5004-99DrillMabee Petroleum Corp.Aug 9, 1977Aug 9, 1977Sep 20, 19777,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 7, 2025Willard A O-11-61080Wasson 72Occidental Permian Ltd.Producing6,870

Formation tops

As filed on W-2/G-1. Subsea from 3,545 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,3201,225
Tansill3,030515
Yates3,112433

Perforations

Perforated and open-hole intervals.

FromToType
—6,842Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37542518395 S
13.37542517.5—
8.6252,34012.25200 S
4.56,8707.875470 S
4.56,8727.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 13, 2026Mar 3, 2026—
00Jan 12, 1984Dec 2, 1977—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50131467, documented in the API reference.