WELLS · OKLAHOMA · ONE ROW PER API NUMBER
Arrington CJM Inc wells
Every well OCC has on file, newest intent to drill first: who operates it, where it is, the formation it is completed in, and what it injected over the last twelve reported months.What an API number is →
A full API number opens the well. Anything else filters the list below.
No oil or gas production is available for Oklahoma. The last column is the water a well injected.
14 WELLS · PAGE 1 OF 1
These wells on a map →| Well | Operator | County, formation | Status | Depth, ft | Permit | Completed | Injected, 12 mo |
|---|---|---|---|---|---|---|---|
| Jenkins #1-1435-025-21044 | Arrington CJM Inc | CimarronChester | PluggedOil | 4,887 | Jan 11, 2013 | Aug 30, 2010 | — |
| Jenkins #2-14HHZ35-025-21046 | Arrington CJM Inc | Cimarron | No evidence of a wellNo type on file | 6,938 | Oct 25, 2010 | — | — |
| Big Mac #1-535-153-23492 | Arrington CJM Inc | Woodward | PluggedDry hole | 7,500 | Sep 15, 2008 | Oct 4, 2008 | — |
| Sleeper #135-139-23511 | Arrington CJM Inc | Texas | PluggedDry hole | 6,100 | Sep 17, 2002 | Oct 5, 2002 | — |
| McGill Trust #2-2135-151-20651 | Arrington CJM Inc | Woods | PluggedDry hole | 1,200 | Jan 19, 2001 | Sep 26, 1976 | — |
| Cohen #135-133-24012 | Arrington CJM Inc | Seminole | PluggedGas | 4,415 | Jul 28, 1992 | Aug 25, 1992 | — |
| Whisennand #135-139-22379 | Arrington CJM Inc | Texas | PluggedNo type on file | 4,784 | Feb 26, 1991 | Mar 28, 1991 | — |
| L.c.sleeper #135-139-21294 | Arrington CJM Inc | Texas | PluggedGas | 6,300 | Oct 1, 1990 | Mar 11, 1980 | — |
| Chambless (Madaline Howell) #135-099-20443 | Arrington CJM Inc | Murray | PluggedDry hole | 4,372 | — | Sep 15, 1986 | — |
| Chambless #235-099-20539 | Arrington CJM Inc | Murray | PluggedDry hole | 4,600 | — | Sep 14, 1993 | — |
| Jackson #135-125-23350 | Arrington CJM Inc | Pottawatomie | PluggedDry hole | 4,262 | — | Sep 23, 1994 | — |
| Hawkins #235-133-24127 | Arrington CJM Inc | Seminole | PluggedDry hole | 4,530 | — | Jan 27, 1995 | — |
| Hawkins #335-133-24146 | Arrington CJM Inc | Seminole | PluggedDry hole | 4,512 | — | Feb 8, 1996 | — |
| Unit-Sleeper #135-139-21568 | Arrington CJM Inc | Texas | PluggedGas | 6,038 | — | Nov 11, 1981 | — |
INJECTED WATER IN BBL · TWELVE MONTHS THROUGH THE STATE'S REPORTED-THROUGH MONTH · A DASH MEANS NONE REPORTED · NO PRODUCTION IS AVAILABLE FOR OKLAHOMA
About this data
One row per API number from the Oklahoma Corporation Commission's well file. Status and type are shown in OCC's own words; the filters use one vocabulary shared by every state. The intent to drill, completion date, depth, and formation come from the well's own filings. Injected water is what operators filed on form 1012A, summed over the twelve months ending in the last month whose filings are in. No oil or gas production is available for Oklahoma. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells?state=ok, documented in the API reference.