WELL · 42-107-31565 · DISTRICT 8

Bryant B-1045 Etal #4558

Y

Crosby County · Hoople (Clear Fork) field · Producing  · Directional

Bryant B-1045 Etal #4558 (API 42-107-31565) is a well in Crosby County operated by Juno Operating Company II LLC, completed November 16, 2012 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 13, 2012, permitted to 4,456 ft.

Completion filings report 3 formation tops, including Rustler, Glorieta, Clear Fork.

Its 2 leases have reported 241K barrels of oil since February 2012, last reporting in July 2026. The leases carry 74 wells, so these are lease totals, not this well alone.

Operator of record

Juno Operating Company II LLC

Based in
Plano, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 1, 2016
Permits on file
544
Phone
(214) 239-3950

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSurge Operating LLC
Production reportsSurge Operating, LLCthrough Apr 2026
Latest permitJuno Operating Company II, LLCJun 13, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,456
total depth, ft
2
permits on file
Jun 13, 2012
last permit issued
Nov 16, 2012
completed
241K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 16, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Inactive (I)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 74 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
NE Ridge Upper Clearfork Unit O-11-69916Hoople (Clear Fork)Surge Operating, LLC46219K0Oct 2012 – Jul 2026
Bryant, B-1045, Etal O-11-69788Hoople (Clear Fork)Juno Operating Company II, LLC2821.7K0Feb 2012 – Mar 2013

Oil, barrels lease total

Last 12 months 3,174 · prior 12 3,406(-7%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Juno Operating Company II, LLCFeb 2012 → Aug 2015
  2. 2Surge Operating, LLCSep 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
741066-98DrillJuno Operating Company II, LLCSep 14, 2012Jun 13, 2012Sep 2, 20125,000
741066-99DrillJuno Operating Company II, LLCMay 18, 2012Jun 13, 2012Sep 2, 20125,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 25, 2014NE Ridge Upper Clearfork Unit O-11-69916Hoople (Clear Fork)Surge Operating LLCShut IN · shut in Aug 1, 20144,456
Nov 16, 2012Bryant B-1045 Etal O-11-69788Hoople (Clear Fork)Juno Operating Company II LLCProducing4,456

Formation tops

As filed on W-2/G-1. Subsea from 3,061 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,2851,776
GlorietaGLORIETTA3,928-867
Clear Fork4,136-1,075
Clear ForkCLEARFORK4,136-1,075

Perforations

Perforated and open-hole intervals.

FromToType
4,4564,468Perforated
4,4764,488Perforated
4,5004,526Perforated
4,5404,552Perforated
4,5654,596Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,32212.25650 S
5.54,8817.8751,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 3, 2019Jun 4, 2019—
00May 2, 2014Aug 29, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000110367H-1 InjectionNot activated4,0002,2004,400–4,800

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

012015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10731565, documented in the API reference.