WELL · 42-135-08445 · DISTRICT 8
Embar #25
Ector County · Loretta (Glorieta) field · Vertical
Embar #25 (API 42-135-08445) is a plugged well in Ector County, plugged July 27, 2006, last operated by Conocophillips Company.
The RRC has issued one drilling permit, issued October 13, 1997, permitted to 5,600 ft.
It was permitted by Phillips Petroleum Company and has since transferred to Conocophillips Company on the wellbore schedule.
Completion filings report 10 formation tops, including Rustler, Yates, San Andres, Holt.
Its 3 leases have reported 4.14M barrels of oil and 3.51M mcf of gas since January 1993, last reporting in July 2026. The leases carry 49 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 3, 2026
- Permits on file
- 3,290
- Phone
- (432) 683-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Conocophillips Company |
| Production reports | Maverick Permian LLCthrough Apr 2026 |
| Latest permit | Phillips Petroleum CompanyOct 13, 1997 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,600
- total depth, ft
- 1
- permits on file
- Oct 13, 1997
- last permit issued
- Mar 14, 1998
- completed
- 4.14M
- cumulative oil, bbl
- 3.51M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 14, 1998
- Shut in
- —
- Plugged
- Jul 27, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 49 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| South Fault Block Unit O-10-27818 | Andector (Ellenburger) | Maverick Permian LLC | 45 | 4.13M | 3.32M | Jan 1993 – Jul 2026 |
| Embar O-10-14198 | Goldsmith (5600) | Conocophillips Company | 2 | 8.78K | 61.7K | Jan 1993 – Feb 2007 |
| Embar O-10-35564 | Loretta (Glorieta) | Conocophillips Company | 2 | 643 | 129K | Aug 1997 – Aug 2006 |
Oil, barrels lease total
Last 12 months 67,580 · prior 12 64,221(+5%)
Gas, mcf lease total
Last 12 months 40,518 · prior 12 35,813(+13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Phillips Petroleum CompanyJan 1993 → Dec 2002
- 2Conocophillips CompanyJan 2003 → Mar 2022
- 3Maverick Permian LLCApr 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 468707-99 | Recompletion | Phillips Petroleum Company | Oct 13, 1997 | Oct 13, 1997 | Oct 24, 1997 | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 14, 1998 | Embar O-10-35564 | Loretta (Glorieta) | Conocophillips Company | Plugged | — |
| Aug 8, 1994 | Embar O-10-14198 | Goldsmith (5600) | Conocophillips Company | Plugged | — |
| — | South Fault Block Unit O-10-27818 | Andector (Ellenburger) | Maverick Permian LLC | Plugged | — |
| — | Embar O-10-219 | Andector (Ellenburger) | Phillips Petroleum Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,183 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 1,535 | 1,648 |
| Yates | 2,673 | 510 |
| San Andres | 4,060 | -877 |
| Holt | 4,863 | -1,680 |
| Glorieta | 5,122 | -1,939 |
| Clear Fork | 5,448 | -2,265 |
| Clear ForkCLEARFORK | 5,448 | -2,265 |
| Clear ForkUPPER CLEARFORK | 5,448 | -2,265 |
| Lwer Clearfork | 5,974 | -2,791 |
| Fullerton | 6,110 | -2,927 |
| Wolfcamp | 7,812 | -4,629 |
| Ellenburger | 8,270 | -5,087 |
| Ellenburger | 8,314 | -5,131 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,255 | 5,270 | Perforated |
| 5,686 | 5,854 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 209 | 17.25 | 225 S |
| 13.375 | 210 | 17.25 | 225 S |
| 8.625 | 3,911 | 11 | 2,450 S |
| 5.5 | 8,459 | 7.875 | — |
| 5.5 | 8,460 | 7.875 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 5, 2000 | Mar 23, 1998 | — |
| 00 | May 5, 1998 | Mar 5, 1998 | Yes |
| 00 | Apr 23, 1998 | Aug 10, 1994 | — |
| 00 | Nov 10, 1994 | Aug 10, 1994 | — |
| 00 | Sep 14, 1994 | Apr 6, 1994 | — |
| 00 | Jan 12, 1984 | Oct 29, 1974 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-08445 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-08445 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Oct 1995
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000058901 | H-1 Injection | Plugged Aug 16, 2006 | 0 | 0 | 8,430–8,440 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13508445, documented in the API reference.