TEXAS · WELLS · ECTOR COUNTY · API 42-135-34731 · DISTRICT 7B

Goldsmith San Andres Unit #1419

Shut in

Ector County · Goldsmith field · Shut In  · Vertical

Goldsmith San Andres Unit #1419 (API 42-135-34731) is a well in Ector County operated by Hilcorp Energy Company, completed November 30, 2017 and listed as shut in on the RRC schedule, shut in November 1, 2017.

The RRC has issued 2 drilling permits between 1984 and 1993, permitted to 5,900 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 11 formation tops, including Rustler, Salado, Yates, Seven Rivers.

Its 2 leases have reported 23.2M barrels of oil and 30.4M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 1,420 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Feb 5, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,900
total depth, ft
2
permits on file
Feb 5, 1993
last permit issued
Nov 30, 2017
completed
23.2M
cumulative oil, bbl
30.4M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 30, 2017
Shut in
Nov 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 1,420 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith San Andres Unit O-10-2020GoldsmithHilcorp Energy Company72114.8M20.4MJan 1993 – Apr 2026
Goldsmith, C. A., Etal O-10-2290Goldsmith (5600)XTO Energy Inc.6998.37M9.94MJan 1993 – Sep 2006

Oil, barrels lease total

Last 12 months 147,773 · prior 12 107,674(+37%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 481,583 · prior 12 198,231(+143%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Mar 2025
  3. 3Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
408697-99RecompletionChevron U. S. A. Inc.Feb 3, 1993Feb 5, 1993Feb 15, 19935,900
260433-99DrillGulf Oil Corp.Dec 10, 1984Dec 10, 1984—6,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 30, 2017Goldsmith San Andres Unit O-10-2020GoldsmithHilcorp Energy CompanyShut In · shut in Nov 1, 20175,900
Jan 31, 1985Goldsmith C. A. Etal O-10-2290Goldsmith (5600)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 3,120 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,4131,707
Rustler1,4141,706
Salado1,5211,599
Salado1,5761,544
Yates2,656464
Seven Rivers2,769351
Queen3,496-376
Grayburg3,674-554
San Andres3,969-849
Holt4,845-1,725
Glorieta4,981-1,861
56005,054-1,934
Clear ForkCLEARFORK5,412-2,292

Perforations

Perforated and open-hole intervals.

FromToType
4,0884,184Perforated
4,1074,111Perforated
4,1284,132Perforated
4,1564,160Perforated
4,1804,184Perforated
5,2685,826Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,41512.25700 S
5.55,9007.8751,550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 19, 2018Jan 23, 2018—
00Apr 12, 2012Jun 3, 2011—
00Jan 25, 2002Dec 12, 2001—
00Apr 5, 1993Mar 2, 1993Yes
00Mar 11, 1993——
00Mar 19, 1985Feb 20, 1985—
00Mar 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13534731, documented in the API reference.