TEXAS · WELLS · ECTOR COUNTY · TXL '43-13' LEASE · API 42-135-36092 · DISTRICT 7B

TXL 43-13 #2

Plugged

Ector County · Cowden South (Canyon 8900) field  · Vertical

Txl 43-13 #2 (API 42-135-36092) is a plugged well in Ector County, plugged August 31, 2026, last operated by Oxy USA Inc..

The RRC has issued one drilling permit, issued June 1, 1989, permitted to 9,800 ft.

It was permitted by Conoco Inc. and has since transferred to Oxy USA Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Grayburg, San Andres, Glorieta, Clear Fork.

Its lease has reported 141K barrels of oil and 414K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA Inc.

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 26, 2026
Permits on file
3,316
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsOXY USA Inc.through Jul 2008
Latest permitConoco Inc.Jun 1, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
1
permits on file
Jun 1, 1989
last permit issued
Oct 18, 1989
completed
141K
cumulative oil, bbl
414K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 18, 1989
Shut in
—
Plugged
Aug 31, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
TXL '43-13' O-10-31973Cowden, South (Canyon 8900)OXY USA Inc.2141K414KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Jan 1993 → Jan 1996
  2. 2Enervest Operating, L.L.C.Feb 1996 → Feb 1998
  3. 3Coda Energy, Inc.Mar 1998 → Aug 1998
  4. 4Belco Energy Corp.Sep 1998 → Feb 2002
  5. 5Westport Oil and Gas Company, LPMar 2002 → May 2002
  6. 6Saga Pet. Ltd Liability Co of CoJun 2002 → Apr 2004
  7. 7Latigo Petroleum Texas, LPMay 2004 → Feb 2008
  8. 8OXY USA Inc.Mar 2008 → Jul 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
359846-99DrillConoco Inc.May 30, 1989Jun 1, 1989Sep 9, 19899,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 18, 1989TXL 43-13 O-10-31973Cowden South (Canyon 8900)OXY USA Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,960 ft elevation.Download CSV →

FormationMD ftSubsea
Grayburg4,300-1,340
San Andres4,720-1,760
Glorieta5,100-2,140
Clear ForkCLEARFORK6,300-3,340
Cisco8,820-5,860
Canyon8,920-5,960

Perforations

Perforated and open-hole intervals.

FromToType
9,0829,086Perforated
9,1029,136Perforated
9,1409,172Perforated
9,1769,196Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37530017.5350 S
9.6256,00012.251,800 S
79,6008.75400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 1989Nov 2, 1989Yes
00Dec 2, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13536092, documented in the API reference.