TEXAS · WELLS · GLASSCOCK COUNTY · BLALOCK 1313 LEASE · API 42-173-38526 · DISTRICT 7B

Blalock 1313 #1313AH

Y

Glasscock County · Spraberry (Trend Area) field · Producing  · Horizontal

Blalock 1313 #1313AH (API 42-173-38526) is a horizontal well in Glasscock County operated by Xto Energy Inc., completed June 22, 2022 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 26, 2021, permitted to 8,194 ft.

Completion filings report 10 formation tops, including Santa Rosa, Rustler, Yates, Seven Rivers.

Its lease has reported 656K barrels of oil and 1.79M mcf of gas since October 2021, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Jul 26, 2021
8,194
total depth, ft
1
permits on file
Jul 26, 2021
last permit issued
Jun 22, 2022
completed
656K
cumulative oil, bbl
1.79M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2021 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 22, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blalock 1313 O-10-57257Spraberry (Trend Area)XTO Energy Inc.2656K1.79MOct 2021 – Jul 2026

Oil, barrels lease total

Last 12 months 61,515 · prior 12 101,097(-39%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 370,129 · prior 12 432,683(-14%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Jun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
871455-99DrillXTO Energy Inc.Jul 22, 2021Jul 26, 2021Apr 26, 202210,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 22, 2022Blalock 1313 O-10-57257Spraberry (Trend Area)XTO Energy Inc.Producing8,194

Formation tops

As filed on W-2/G-1. Subsea from 2,552 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa6681,884
Santa Rosa7471,805
Rustler1,1991,353
Rustler1,3071,245
Yates2,047505
Yates2,083469
Seven Rivers2,245307
Seven Rivers2,248304
Queen2,908-356
Queen3,013-461
Grayburg3,350-798
Grayburg3,547-995
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO3,584-1,032
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO3,606-1,054
Glorieta4,407-1,855
Glorieta4,446-1,894
Clear ForkCLEARFORK5,151-2,599
Clear ForkCLEARFORK5,559-3,007
Spraberry6,214-3,662
Spraberry6,216-3,664

Perforations

Perforated and open-hole intervals.

FromToType
8,61219,009Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37589517.5700 S
8.6257,655112,255 S
5.519,0977.8752,030 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 26, 2022Sep 12, 2022Yes
00Aug 15, 2022May 23, 2022Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.