TEXAS · WELLS · HOCKLEY COUNTY · SLAUGHTER CONSOLIDATED LEASE · API 42-219-36741 · DISTRICT 7B
Slaughter Consolidated #427
Hockley County · Tstar (Abo) field · Producing · Horizontal
Slaughter Consolidated #427 (API 42-219-36741) is a horizontal well in Hockley County operated by Hilcorp Energy Company, completed April 3, 2016 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 2004 and 2016, permitted to 9,337 ft.
It was permitted by Occidental Permian Ltd. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 13 formation tops, including Santa Rosa, Yates, Queen, Grayburg.
Its lease has reported 19M barrels of oil and 17M mcf of gas since January 1999, last reporting volume in April 2026. The lease carries 106 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Occidental Permian Ltd.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Occidental Permian Ltd.Feb 18, 2016 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,337
- total depth, ft
- 2
- permits on file
- Feb 18, 2016
- last permit issued
- Apr 3, 2016
- completed
- 19M
- cumulative oil, bbl
- 17M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1999 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 3, 2016
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 106 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Slaughter Consolidated O-11-68016 | Tstar (Abo) | Hilcorp Energy Company | 106 | 19M | 17M | Jan 1999 – Apr 2026 |
Oil, barrels lease total
Last 12 months 346,211 · prior 12 399,029(-13%)
Gas, mcf lease total
Last 12 months 1,437,396 · prior 12 269,365
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Altura Energy Ltd.Jan 1999 → Apr 2000
- 2Occidental Permian Ltd.May 2000 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 813918-99 | Recompletion | Occidental Permian Ltd. | Feb 18, 2016 | Feb 18, 2016 | Mar 25, 2016 | 8,103 |
| 544715-99 | Drill | Occidental Permian Ltd. | Apr 21, 2004 | Apr 21, 2004 | May 3, 2004 | 8,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 3, 2016 | Slaughter Consolidated O-11-68016 | Tstar (Abo) | Hilcorp Energy Company | Producing | 9,337 |
Formation tops
As filed on W-2/G-1. Subsea from 3,503 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Santa RosaRED BED-SANTA ROSA | 1,098 | 2,405 |
| YatesYATES - OVERPRESSURE, INERT GAS | 2,850 | 653 |
| YatesYATES/SEVEN RIVERS(3083) | 2,858 | 645 |
| Queen | 3,653 | -150 |
| GrayburgGRAYBURG/SAN ANDRES (4129') | 3,931 | -428 |
| San AndresSAN ANDRES - ACTIVE CO2 FLOOD; H | 4,125 | -622 |
| GlorietaGLORIETA/TUBB (6937') | 5,617 | -2,114 |
| Clear ForkCLEARFORK | 7,155 | -3,652 |
| Clear ForkLOWER CLEARFORK | 7,157 | -3,654 |
| Wichita-AlbanyWICHITA ALBANY | 7,415 | -3,912 |
| Wichita-AlbanyWICHITA ALBANY | 7,420 | -3,917 |
| Abo | 7,458 | -3,955 |
| Canyon | — | — |
| Cisco | — | — |
| Strawn | — | — |
| Wolfcamp | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,754 | 7,972 | Perforated |
| 7,754 | 7,972 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,284 | 12.25 | 820 S |
| 5.5 | 8,103 | 7.875 | 2,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 14, 2016 | Jul 29, 2016 | Yes |
| 00 | Dec 8, 2004 | Jul 16, 2004 | Yes |
| 00 | Oct 12, 2004 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received May 17, 2019. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Grayburg, San Andres, Glorieta, Clear Fork, Wichita-Albany, Abo | TIFF | 4,000 to 8,096 | May 17, 2019run May 16, 2004 | 0.09 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-219-36741 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-219-36741 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21936741, documented in the API reference.