WELL · 42-371-39206 · DISTRICT 8

Neal Lethco 28-27 #1H

Y

Pecos County · Hoefs T-K (Wolfcamp) field · Shut IN  · Horizontal

Neal Lethco 28-27 #1H (API 42-371-39206) is a horizontal well in Pecos County operated by Diamondback E&P LLC, completed October 16, 2014 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 14, 2014, permitted to 21,000 ft.

It was permitted by Brigham Resources Operating, LLC and has since transferred to Diamondback E&P LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Toborg, Soma, Rustler, Yates.

Its lease has reported 1.01M barrels of oil and 1.03M mcf of gas since October 2014, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Diamondback E&P LLC

Permitted by Brigham Resources Operating, LLC; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 4, 2026
Permits on file
5,237
Phone
(432) 221-7400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiamondback E&P LLC
Production reportsDiamondback E&P LLCthrough Apr 2026
Latest permitBrigham Resources Operating, LLCJun 14, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

21,000
total depth, ft
1
permits on file
Jun 14, 2014
last permit issued
Oct 16, 2014
completed
1.01M
cumulative oil, bbl
1.03M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 16, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal Lethco 28-27 O-10-45822Hoefs T-K (Wolfcamp)Diamondback E&P LLC31.01M1.03MOct 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 39,663 · prior 12 46,258(-14%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 109,290 · prior 12 58,557(+87%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brigham Resources Operating, LLCOct 2014 → Feb 2017
  2. 2Diamondback E&P LLCMar 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
786727-99DrillBrigham Resources Operating, LLCMay 9, 2014Jun 14, 2014Jun 28, 201421,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-45822————

Formation tops

As filed on W-2/G-1. Subsea from 2,737 ft elevation.Download CSV →

FormationMD ftSubsea
Toborg3102,427
Soma8001,937
Rustler1,2101,527
Yates1,3051,432
Seven Rivers1,5401,197
Grayburg1,900837
O'Brien2,500237
Glorieta2,900-163
Tubb3,200-463
Queen3,450-713

Perforations

Perforated and open-hole intervals.

FromToType
10,17517,285Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,22213.5965 S
7.62510,0159.8751,255 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 5, 2015Feb 11, 2015Yes
00Mar 4, 2015Jan 9, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/37139206, documented in the API reference.