WELL · 42-371-39552 · DISTRICT 8
Neal Lethco 28-27 #2WA
Pecos County · Hoefs T-K (Wolfcamp) field · Producing · Horizontal
Neal Lethco 28-27 #2WA (API 42-371-39552) is a horizontal well in Pecos County operated by Diamondback E&P LLC, completed August 16, 2019 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 15, 2017, permitted to 11,000 ft.
Completion filings report 10 formation tops, including Glorieta, Grayburg, O'Brien, Queen.
Its lease has reported 1.01M barrels of oil and 1.03M mcf of gas since October 2014, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 4, 2026
- Permits on file
- 5,237
- Phone
- (432) 221-7400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Diamondback E&P LLC |
| Production reports | Diamondback E&P LLCthrough Apr 2026 |
| Latest permit | Diamondback E&P LLCMay 15, 2017 |
- 11,000
- total depth, ft
- 1
- permits on file
- May 15, 2017
- last permit issued
- Aug 16, 2019
- completed
- 1.01M
- cumulative oil, bbl
- 1.03M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 16, 2019
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neal Lethco 28-27 O-10-45822 | Hoefs T-K (Wolfcamp) | Diamondback E&P LLC | 3 | 1.01M | 1.03M | Oct 2014 – Jul 2026 |
Oil, barrels lease total
Last 12 months 39,663 · prior 12 46,258(-14%)
Gas, mcf lease total
Last 12 months 109,290 · prior 12 58,557(+87%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brigham Resources Operating, LLCOct 2014 → Feb 2017
- 2Diamondback E&P LLCMar 2017 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 826341-99 | Drill | Diamondback E&P LLC | May 5, 2017 | May 15, 2017 | Jun 27, 2017 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-45822 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,736 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,963 | 17,216 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,524 | 13.5 | 1,250 S |
| 7.625 | 9,325 | 9.875 | 1,517 S |
| 5.5 | 17,349 | 6.75 | 2,360 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 15, 2022 | Apr 27, 2022 | — |
| 00 | Jun 13, 2018 | Apr 9, 2018 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-371-39552 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-371-39552 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/37139552, documented in the API reference.