WELL · 42-475-30240 · DISTRICT 8
Barstow -26- #20D
Ward County · Scott (Cherry Canyon) field · Vertical
Barstow -26- #20D (API 42-475-30240) is a plugged well in Ward County, plugged July 16, 2021, last operated by Jetta Operating Company Inc..
The RRC has issued 3 drilling permits between 2007 and 2016, permitted to 17,905 ft.
Completion filings report 13 formation tops, including Lamar, Bell Canyon, Delaware, Chery Canyon.
Its 3 leases have reported 590K barrels of oil and 944K mcf of gas since January 1993, last reporting in November 2021. The leases carry 10 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jul 2, 2026
- Permits on file
- 605
- Phone
- (817) 639-2332
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Jetta Operating Company Inc. |
| Production reports | Jetta Operating Company, Inc.through Jan 2020 |
| Latest permit | Jetta Operating Company, Inc.Jan 25, 2016 |
- 17,905
- total depth, ft
- 3
- permits on file
- Jan 25, 2016
- last permit issued
- Mar 10, 2008
- completed
- 590K
- cumulative oil, bbl
- 944K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 10, 2008
- Shut in
- —
- Plugged
- Jul 16, 2021
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Barstow -26- O-10-47590 | Pyote Bay (Brushy Canyon) | Jetta Operating Company, Inc. | 1 | 0 | 0 | Mar 2015 – Nov 2021 |
| Barstow -26- O-10-26481 | Scott (Cherry Canyon) | Jetta Operating Company, Inc. | 8 | 590K | 944K | Jan 1993 – Nov 2020 |
| Barstow Unit G-10-242117 | Barstow (Fusselman) | Jetta Operating Company, Inc. | 1 | 0 | 9 | Mar 2008 – Feb 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Santa FE Energy Resources, Inc.Jan 1993 → Oct 1999
- 2Santa FE Snyder CorporationNov 1999 → Oct 2000
- 3Devon SFS Operating, Inc.Nov 2000 → Jun 2002
- 4Jetta Operating Company, Inc.Jul 2002 → Jan 2020
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 813342-99 | Recompletion | Jetta Operating Company, Inc. | Jan 19, 2016 | Jan 25, 2016 | Mar 3, 2015 | 17,902 |
| 756358-99 | Recompletion | Jetta Operating Company, Inc. | Feb 6, 2013 | Apr 16, 2013 | Feb 12, 2013 | 7,500 |
| 651294-99 | Reenter | Jetta Operating Company, Inc. | Dec 12, 2007 | Dec 18, 2007 | Dec 8, 2007 | 17,905 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-242117 | — | — | — | — |
| — | — O-10-26481 | — | — | — | — |
| — | — O-10-47590 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,624 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lamar | 4,799 | -2,175 |
| Bell Canyon | 4,822 | -2,198 |
| Delaware | 4,831 | -2,207 |
| Chery Canyon | 5,767 | -3,143 |
| Cherry Canyon | 5,776 | -3,152 |
| Clear ForkCLEARFORK | — | — |
| Glorieta | — | — |
| Holt | — | — |
| Queen | — | — |
| Rustler | — | — |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | — | — |
| Seven Rivers | — | — |
| Yates | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,607 | 6,813 | Perforated |
| 8,124 | 8,244 | Perforated |
| 17,667 | 17,745 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 30 | 65 | 26 | 1,300 S |
| 20 | 1,097 | 17.5 | 3,850 S |
| 20 | 1,097 | — | — |
| 13.375 | 4,800 | 17.5 | 250 S |
| 13.375 | 4,800 | 12.75 | 1,950 S |
| 3.5 | 10,912 | — | — |
| 10.75 | 11,505 | 12.25 | 212 S |
| 10.75 | 11,505 | 10.75 | 2,150 S |
| 10.75 | 11,508 | 12.25 | 1,950 S |
| 7.875 | 16,833 | 9.5 | 3,350 S |
| 7.875 | 16,833 | 12.071 | 3,350 S |
| 7.625 | 16,833 | — | — |
| 5 | 17,902 | 6.5 | 400 S |
| 5 | 17,902 | 12.25 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 18, 2016 | Apr 28, 2016 | — |
| 00 | Feb 24, 2016 | Jan 25, 2016 | — |
| 00 | Nov 18, 2013 | Apr 17, 2013 | — |
| 00 | Feb 23, 2009 | Aug 1, 2008 | — |
| 00 | Dec 11, 2008 | Mar 31, 2008 | Yes |
| 00 | Nov 14, 2008 | — | — |
| 00 | Jan 12, 1984 | Dec 3, 1970 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-30240 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-30240 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 9.02M
- bbl, all reported
- Jul 2021
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000098917 | H-1 Injection | Plugged Oct 28, 2021 | 30,000 | 3,000 | 6,500–8,400 |
| 000088474 | W-14 Disposal | Plugged Aug 13, 1981 | 1,500 | 2,000 | 15,732–15,832 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47530240, documented in the API reference.