TEXAS · WELLS · WARD COUNTY · API 42-475-36737 · DISTRICT 7B
Searls 34-115 #2H
Ward County · Phantom (Wolfcamp) field · Producing · Horizontal
Searls 34-115 #2H (API 42-475-36737) is a horizontal well in Ward County operated by Apache Corporation, completed September 9, 2014 and listed as producing on the RRC schedule, shut in August 1, 2026.
The RRC has issued one drilling permit, issued May 16, 2014, permitted to 12,192 ft.
It was permitted by Cimarex Energy CO. and has since transferred to Apache Corporation on the wellbore schedule.
Completion filings report 11 formation tops, including Rustler, Delaware, Bone Spring, Clear Fork.
Its 2 leases have reported 401K barrels of oil and 967K mcf of gas since January 2009, last reporting volume in March 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 3, 2025
- Permits on file
- 9,758
- Phone
- (713) 954-5500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Apache Corporation |
| Production reports | Apache Corporationthrough Mar 2026 |
| Latest permit | Cimarex Energy Co.May 16, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,192
- total depth, ft
- 1
- permits on file
- May 16, 2014
- last permit issued
- Sep 9, 2014
- completed
- 401K
- cumulative oil, bbl
- 967K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2009 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 9, 2014
- Shut in
- Aug 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Searls 34-115 G-10-300515 | Phantom (Wolfcamp) | Apache Corporation | 1 | 136K | 231K | Sep 2014 – Mar 2026 |
| Searls 34-115 O-10-39431 | Phantom (Wolfcamp) | Apache Corporation | 2 | 266K | 735K | Jan 2009 – Mar 2026 |
Oil, barrels lease total
Last 12 months 553 · prior 12 1,868(-70%)
Gas, mcf lease total
Last 12 months 9,704 · prior 12 7,399(+31%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cimarex Energy Co.Jan 2009 → Aug 2018
- 2Apache CorporationSep 2014 → Mar 2026
- 3Callon Petroleum Operating CoSep 2018 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 785688-99 | Drill | Cimarex Energy Co. | Apr 28, 2014 | May 16, 2014 | Jun 6, 2014 | 13,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 9, 2014 | Searls 34-115 G-10-300515 | Phantom (Wolfcamp) | Apache Corporation | Producing · shut in Aug 1, 2026 | 12,192 |
| Sep 9, 2014 | Searls 34-115 O-10-39431 | Phantom (Wolfcamp) | Apache Corporation | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,603 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 615 | 1,988 |
| Delaware | 5,075 | -2,472 |
| Bone SpringTHIRD BONE SPRING | 10,194 | -7,591 |
| Clear ForkCLEARFORK | — | — |
| Glorieta | — | — |
| Holt | — | — |
| Queen | — | — |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | — | — |
| Seven Rivers | — | — |
| Tubb | — | — |
| Yates | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,850 | 16,330 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,120 | 12.25 | 864 S |
| 7 | 11,735 | 8.75 | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 2025 | Aug 20, 2025 | — |
| 00 | Apr 27, 2015 | Jan 28, 2015 | Yes |
Well logs
2 logs loaded from the RRC's log index, the latest received Feb 5, 2018. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| ResistivitySpans Delaware, Bone Spring | TIFF | 5,124 to 11,900 | Aug 11, 2017 | 2.84 |
| RESISTIVITYSpans Bone Spring | TIFF | 11,149 to 16,453 | Feb 5, 2018run Aug 7, 2014 | 0.48 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-36737 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-36737 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47536737, documented in the API reference.