TEXAS · WELLS · WARD COUNTY · BARSTOW 33-35 LEASE · API 42-475-36784 · DISTRICT 7B

Barstow 33-35 #2H

Y

Ward County · Two Georges (Bone Spring) field · Producing  · Horizontal

Barstow 33-35 #2H (API 42-475-36784) is a horizontal well in Ward County operated by Jetta Operating Company Inc., completed October 25, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued July 2, 2014, permitted to 10,635 ft.

Completion filings report 10 formation tops, including Rustler, Castile, Delaware, Bell Canyon.

Its lease has reported 1.08M barrels of oil and 3.47M mcf of gas since April 2013, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company Inc.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsJetta Operating Company, Inc.through Apr 2026
Latest permitJetta Operating Company, Inc.Jul 2, 2014
10,635
total depth, ft
2
permits on file
Jul 2, 2014
last permit issued
Oct 25, 2014
completed
1.08M
cumulative oil, bbl
3.47M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 25, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barstow 33-35 O-10-46064Two Georges (Bone Spring)Jetta Operating Company, Inc.31.08M3.47MApr 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 49,612 · prior 12 29,134(+70%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 115,400 · prior 12 95,928(+20%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jetta Operating Company, Inc.Apr 2013 → Apr 2026
  2. 2COG Operating LLCApr 2016 → Feb 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
789355-98DrillJetta Operating Company, Inc.Jun 1, 2015Jul 2, 2014Aug 3, 201411,000
789355-99DrillJetta Operating Company, Inc.Jun 12, 2014Jul 2, 2014Aug 3, 201411,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 25, 2014Barstow 33-35 O-10-46064Two Georges (Bone Spring)Jetta Operating Company Inc.Producing10,635

Formation tops

As filed on W-2/G-1. Subsea from 2,588 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler8001,788
CastileCASTILLE2,884-296
DelawareDELAWARE (LAMAR)4,893-2,305
Bell Canyon4,922-2,334
Ford5,042-2,454
Glorieta——
Queen——
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO——
Seven Rivers——
Yates——

Perforations

Perforated and open-hole intervals.

FromToType
11,06715,190Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,87112.251,520 S
710,6678.75375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 20, 2015Mar 18, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536784, documented in the API reference.