TEXAS · WELLS · WINKLER COUNTY · API 42-495-31272 · DISTRICT 7B
Baird W. E. #1252
Winkler County · Keystone (Consolidated) field · Producing · Vertical
Baird W. E. #1252 (API 42-495-31272) is a well in Winkler County operated by Basin Oil & Gas Operating LLC, completed April 11, 2024 and listed as producing on the RRC schedule.
The RRC has issued 2 drilling permits between 1980 and 2007, permitted to 5,501 ft.
It was permitted by Devon Energy Production CO, L.P. and has since transferred to Basin Oil & Gas Operating LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Rustler, Salado, Tansill, Yates.
Its 2 leases have reported 1.8M barrels of oil and 9.39M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 116 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 21, 2026
- Permits on file
- 152
- Phone
- (817) 820-8910
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Basin Oil & Gas Operating LLC |
| Production reports | Basin Oil & Gas Operating, LLCthrough Apr 2026 |
| Latest permit | Devon Energy Production Co, L.P.Jul 12, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,501
- total depth, ft
- 2
- permits on file
- Jul 12, 2007
- last permit issued
- Apr 11, 2024
- completed
- 1.8M
- cumulative oil, bbl
- 9.39M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 11, 2024
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 116 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baird, W. E. O-10-47127 | Keystone (Consolidated) | Basin Oil & Gas Operating, LLC | 81 | 1.23M | 5.3M | Sep 2015 – Apr 2026 |
| Baird, W. E. O-10-12805 | Keystone (Clear Fork) | Devon Energy Production Co, L.P. | 35 | 577K | 4.09M | Jan 1993 – Aug 2015 |
Oil, barrels lease total
Last 12 months 476,443 · prior 12 324,374(+47%)
Gas, mcf lease total
Last 12 months 2,002,974 · prior 12 1,097,666(+82%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
- 2Pennzoil Exploration & Prod. Co.Feb 1995 → Feb 1999
- 3Pennzenergy Exp. & Prod., L.L.C.Mar 1999 → Mar 2000
- 4Devon Energy Production Co, L.P.Apr 2000 → Dec 2018
- 5Stronghold Energy II Oper, LLCJan 2019 → May 2019
- 6Meco IV, LLCJun 2019 → Jun 2021
- 7Meco IV Holdco, LLCJul 2021 → Mar 2022
- 8Basin Oil & Gas Operating, LLCApr 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 641639-99 | Recompletion | Devon Energy Production Co, L.P. | Jun 29, 2007 | Jul 12, 2007 | — | 5,501 |
| 97743-99 | Drill | Chevron U. S. A. Inc. | Oct 31, 1980 | Oct 31, 1980 | — | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 11, 2024 | Baird W. E. O-10-47127 | Keystone (Consolidated) | Basin Oil & Gas Operating LLC | Producing | 5,501 |
| Feb 27, 1981 | Baird W. E. O-10-12805 | Keystone (Clear Fork) | Devon Energy Production Co L.P. | Not on Schedule | — |
| — | Baird W. E. O-10-47127 | Keystone (Consolidated) | Basin Oil & Gas Operating LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,924 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 840 | 2,084 |
| Salado | 1,067 | 1,857 |
| Tansill | 2,380 | 544 |
| Yates | 2,520 | 404 |
| Seven Rivers | 2,790 | 134 |
| Colby/Queen | 3,214 | -290 |
| Grayburg | 3,542 | -618 |
| San Andres | 3,785 | -861 |
| GlorietaGLORIETA/HOLT | 4,864 | -1,940 |
| Clear ForkCLEARFORK | 5,182 | -2,258 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,256 | 5,276 | Perforated |
| 5,289 | 5,468 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,006 | 12.25 | 900 S |
| 2.875 | 5,282 | — | — |
| 5.5 | 5,501 | 7.875 | 1,400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 17, 2024 | Apr 15, 2024 | — |
| 00 | Jan 4, 2016 | Jan 17, 2003 | — |
| 00 | Mar 12, 2003 | Jan 17, 2003 | — |
| 00 | Jan 12, 1984 | Mar 11, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-31272 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-31272 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000127425 | H-1 Injection | Not activated | 7,000 | 2,432 | 4,864–5,501 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49531272, documented in the API reference.