WELL · 42-495-32434 · DISTRICT 8
Campbell Seth #61
Winkler County · Keystone (Consolidated) field · Injection · Vertical
Campbell Seth #61 (API 42-495-32434) is a well in Winkler County operated by Hilcorp Energy Company, completed February 1, 2022 and listed as injection on the RRC schedule.
The RRC has issued 2 drilling permits between 1993 and 2004, permitted to 5,400 ft.
It was permitted by Apache Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 5 formation tops, including Rustler, Colby, San Andres, Glorieta.
Its 3 leases have reported 4.97M barrels of oil and 21.1M mcf of gas since January 1993, last reporting in July 2026. The leases carry 146 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 361K barrels injected in the 12 months reported through August 2025.
Operator of record
Permitted by Apache Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Apache Corporation |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | Apache CorporationJan 14, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,400
- total depth, ft
- 2
- permits on file
- Jan 14, 2004
- last permit issued
- Feb 1, 2022
- completed
- 4.97M
- cumulative oil, bbl
- 21.1M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 1, 2022
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 146 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell, Seth O-10-47618 | Keystone (Consolidated) | Hilcorp Energy Company | 78 | 2.81M | 11.6M | Sep 2015 – Jul 2026 |
| Campbell, Seth O-10-13866 | Keystone (Clear Fork) | Apache Corporation | 67 | 2.16M | 9.47M | Jan 1993 – Aug 2016 |
| Campbell, Seth O-10-37581 | Keystone (Holt) | Apache Corporation | 1 | 0 | 0 | Jul 2004 – Jan 2015 |
Oil, barrels lease total
Last 12 months 94,117 · prior 12 110,759(-15%)
Gas, mcf lease total
Last 12 months 361,095 · prior 12 409,951(-12%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → Feb 1995
- 2Apache CorporationMar 1995 → Nov 2024
- 3Hilcorp Energy CompanyDec 2024 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540562-99 | Recompletion | Apache Corporation | Jan 9, 2004 | Jan 14, 2004 | Jul 14, 2004 | 5,050 |
| 416979-99 | Drill | Texaco E & P Inc. | Oct 12, 1993 | Oct 15, 1993 | Nov 23, 1993 | 6,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 1, 2022 | Campbell Seth O-10-47618 | Keystone (Consolidated) | Hilcorp Energy Company | Injection | 5,400 |
| Aug 18, 2011 | Campbell Seth O-10-13866 | Keystone (Clear Fork) | Apache Corporation | Not on Schedule | — |
| Jul 19, 2004 | Campbell Seth O-10-37581 | Keystone (Holt) | Apache Corporation | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,898 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 900 | 1,998 |
| Colby | 3,100 | -202 |
| San Andres | 3,665 | -767 |
| GlorietaGLORIETTA | 4,748 | -1,850 |
| Clear ForkCLEARFORK | 5,100 | -2,202 |
| Clear Fork | 5,114 | -2,216 |
| Clear ForkCLEARFORK | 5,114 | -2,216 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,114 | 5,271 | Perforated |
| 5,114 | 5,281 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,200 | 11 | 430 S |
| 8.625 | 1,200 | — | 430 S |
| 5.5 | 5,400 | 7.875 | 1,475 S |
| 5.5 | 5,400 | — | 1,475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 12, 2022 | Apr 14, 2022 | — |
| 00 | May 31, 2022 | Feb 1, 2022 | — |
| 00 | May 27, 2016 | Jan 19, 2012 | — |
| 00 | Apr 4, 2012 | Jan 19, 2012 | — |
| 00 | Feb 3, 2006 | Oct 8, 2004 | Yes |
| 00 | Nov 28, 2005 | — | — |
| 00 | Feb 10, 1994 | Dec 22, 1993 | Yes |
| 00 | Jan 11, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-495-32434 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-495-32434 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 361K
- bbl, last 12 reported months
- 5.74M
- bbl, all reported
- Aug 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000103205 | H-1 Injection | Active | 7,500 | 2,550 | 5,100–5,354 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 361,180 · prior 12 206,095(+75%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/49532434, documented in the API reference.