TEXAS · WELLS · WINKLER COUNTY · UNIVERSITY BLK 20 LEASE · API 42-495-33671 · DISTRICT 7B

University BLK 20 #1306H

Shut in

Winkler County · Two Georges (Bone Spring) field · Shut In  · Horizontal

University Blk 20 #1306H (API 42-495-33671) is a horizontal well in Winkler County operated by Xto Energy Inc., completed August 3, 2025 and listed as shut in on the RRC schedule, shut in July 1, 2025.

The RRC has issued one drilling permit (amended once), issued March 4, 2015, permitted to 12,059 ft.

Completion filings report 13 formation tops, including Rustler, Delaware, Cherry Canyon, Brushy Canyon.

Its lease has reported 3.31M barrels of oil and 3.44M mcf of gas since December 2011, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Mar 4, 2015
12,059
total depth, ft
2
permits on file
Mar 4, 2015
last permit issued
Aug 3, 2025
completed
3.31M
cumulative oil, bbl
3.44M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 3, 2025
Shut in
Jul 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University BLK 20 O-10-42354Two Georges (Bone Spring)XTO Energy Inc.123.31M3.44MDec 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 125,335 · prior 12 106,360(+18%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 301,711 · prior 12 92,022(+228%)

020K40K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Dec 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
804271-98DrillXTO Energy Inc.Apr 27, 2016Mar 4, 2015May 24, 201520,854
804271-99DrillXTO Energy Inc.Mar 3, 2015Mar 4, 2015May 24, 201520,854

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 3, 2025University BLK 20 O-10-42354Two Georges (Bone Spring)XTO Energy Inc.Shut In · shut in Jul 1, 202512,059

Formation tops

As filed on W-2/G-1. Subsea from 2,804 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler7742,030
RustlerRUSTLER - POSSIBLE FLOW; POSSIBL7742,030
Delaware5,168-2,364
Cherry Canyon6,116-3,312
Brushy Canyon7,570-4,766
Bone SpringBONE SPRINGS8,784-5,980
Clear ForkCLEARFORK——
Colby-Queen——
Glorieta——
Holt——
QueenQUEEN-SEVEN RIVERS——
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO——
Wichita-AlbanyWICHITA ALBANY——
Yates——

Perforations

Perforated and open-hole intervals.

FromToType
12,24020,600Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37542717.5518 S
75,2008.751,406 S
712,3358.751,061 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 25, 2025Aug 11, 2025—
00Jun 9, 2016Feb 9, 2016Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/49533671, documented in the API reference.