WELL · 42-501-34023 · DISTRICT 8

Randall E. #42

N

Yoakum County · Bruce (Wolfcamp) field  · Vertical

Randall E. #42 (API 42-501-34023) is a well in Yoakum County operated by Hilcorp Energy Company, completed September 29, 1995.

The RRC has issued 2 drilling permits between 1995 and 2001, permitted to 9,700 ft.

It was permitted by Exxon Mobil Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 12 formation tops, including Rustler, Queen, San Andres, Glorieta.

Its 3 leases have reported 2.13M barrels of oil and 703K mcf of gas since January 1993, last reporting in July 2026. The leases carry 23 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Exxon Mobil Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitExxon Mobil CorporationApr 2, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
2
permits on file
Apr 2, 2001
last permit issued
Sep 29, 1995
completed
2.13M
cumulative oil, bbl
703K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 29, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 23 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Randall, E. O-11-66948Bruce (Wolfcamp)Hilcorp Energy Company8900K262KJan 1993 – Jul 2026
Randall, E. O-11-66970Bruce (Silurian)Hilcorp Energy Company8718K92.9KFeb 1993 – Jul 2026
Randall, E. O-11-67640Wasson (Wichita Albany)Hilcorp Energy Company7513K347KOct 1996 – Jul 2026

Oil, barrels lease total

Last 12 months 7,963 · prior 12 7,231(+10%)

01K2K202420252026

Gas, mcf lease total

Last 12 months 26 · prior 12 848(-97%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Apr 2004
  3. 3XTO Energy Inc.May 2004 → Mar 2025
  4. 4Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
506890-99RecompletionExxon Mobil CorporationMar 22, 2001Apr 2, 2001Apr 12, 20019,660
434431-99DrillExxon Corp.Mar 31, 1995May 1, 1995Jul 1, 19959,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66948————
—— O-11-66948————
—— O-11-66970————
—— O-11-67640————

Formation tops

As filed on W-2/G-1. Subsea from 3,632 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,1901,442
Queen3,61616
San Andres4,638-1,006
Glorieta5,835-2,203
Clear ForkCLEARFORK6,950-3,318
L. Clearfork6,950-3,318
Wichita-AlbanyWICHITA ALBANY8,259-4,627
Wolfcamp8,725-5,093
Pennsylvanian8,885-5,253
Pennylvanian8,885-5,253
Woodford9,470-5,838
Silurian (undifferentiated)SILURIAN9,525-5,893

Perforations

Perforated and open-hole intervals.

FromToType
8,3788,392Perforated
8,3788,488Perforated
8,3788,748Perforated
8,3968,400Perforated
8,4078,421Perforated
8,4268,448Perforated
8,4728,488Perforated
8,7908,798Perforated
8,8068,816Perforated
9,5339,553Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,16717.51,530 S
9.6252,16712.253,500 S
9.6255,83012.253,500 S
79,6588.751,050 S
79,6888.751,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 5, 2009Apr 20, 2009—
00Apr 11, 2007Dec 8, 2006Yes
00Dec 14, 2006Aug 7, 2001—
00Sep 20, 2001Aug 7, 2001—
00Oct 31, 2000Sep 7, 2000—
00Sep 25, 2000Nov 10, 1995—
00Dec 27, 1995Nov 10, 1995—
00Nov 29, 1995—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50134023, documented in the API reference.